Office of Public Works (OPW) has 7 open tenders accepting bids right now, most of them in Professional Services and Construction. 101 tender notices have come from this buyer since monitoring began.
Office of Public Works (OPW) has awarded 808 contracts totalling €704.2M between 2013 and 2026. Top supplier by disclosed value is PJ Hegarty and Sons Building Contractor (Cork) (1 award).
Its three largest suppliers hold 60% of the disclosed value. 98 companies have won here in more than one year. 161 of the 613 awards with a published bid count drew a single bidder.
Public buyers rarely change supplier mid-contract. The opening is usually a new requirement, not a switch.
Follow the companies already winning Office of Public Works (OPW) contracts
7
Open now
101
Tender notices tracked
808
Contract awards
€704.2M
Disclosed value
€1.6M
Average per award
578
With named winner
Open Office of Public Works (OPW) tenders
7 liveGeogrid and Geotextile Materials for Constructing Access Haul Roads and Flood Defence Earthen Embankments for the Office of Public Works, South West Region
Office of Public Works (OPW)
Verify deadline on the official notice before bidding.
Procurement of Works Contractor (Including PSCS) for Conservation and Adaptation of 14-17 Moore St, Dublin 1 and provision of New Visitor Facility at 8-9 Moore Lane, Dublin 1
Office of Public Works (OPW)
Deadline TBC: verify on the official notice.
Supply of 14-16 tonne Standard Radius Hydraulic Excavators
Office of Public Works (OPW)
Verify deadline on the official notice before bidding.
Official Passenger and Cargo Ferry Transportation Service for the Office of Public Works, Sceilg Mhichíl, Co. Kerry
Office of Public Works (OPW)
Verify deadline on the official notice before bidding.
The provision of a mobile app to facilitate the booking of desks, lockers and parking spaces at the Office of Public Works, 1GQ, 1 Georges Quay, Dublin 2. D02 Y098
Office of Public Works (OPW)
Verify deadline on the official notice before bidding.
B701 210001 Fire Upgrade, Universal Access and Garda Estate Management (Elective) Works at Castletownbere Garda Station, Co Cork
Office of Public Works (OPW)
Deadline TBC: verify on the official notice.
Total Facility Management Services to the Office of Public Works (OPW) for Northside Civic Centre and Roscommon Government Buildings
Office of Public Works (OPW)
Deadline TBC: verify on the official notice.
Recently closed
Most recent 6 of 94Design, Manufacture, Supply and Delivery of Heritage Trail Signs in the Phoenix Park
Office of Public Works (OPW)
Electric 4WD Utility Terrain Vehicle
Office of Public Works (OPW)
Osmond House - Civil and Structural Consultancy Services and PSDP Services
Office of Public Works (OPW)
New Pedestrian Footpath Works and Ancillaries, at the Irish National War Memorial Gardens, Islandbridge, Dublin 8
Office of Public Works (OPW)
Supply and delivery of Compact Skid Steer Loader (Wheeled Variant) (5-7 Units).
Office of Public Works (OPW)
Supply and Delivery of Mobile Elevated Work Platform (MEWP) (5-7 Units)
Office of Public Works (OPW)
Closed notices are retained as a signal of what this authority actually procures. Deadlines have passed, do not bid.
Awarded in 2026
Office of Public Works (OPW) has 160 published contract awards in 2026 tracked on Tenderwatch, worth €43.6M across the 102 awards with published values.
Top winners in 2026
- Murphy Geospatial Ltd (A Woolpert Company)5 awards
- Ward Personnel Limited4 awards
- Quest Systems4 awards
- Crewit Resourcing Ltd.4 awards
- Ideagen Ltd3 awards
Top suppliers awarded
- 1.PJ Hegarty and Sons Building Contractor (Cork)1 · €20.0M
- 2.Farrell Furniture1 · €17.0M
- 3.PUNCH Consulting Engineers1 · €13.0M
- 4.ACTAVO2 · €10.0M
- 5.Clardex Systems Ltd. t/a Mongey Communications1 · €10.0M
- 6.Ward and Burke Construction Ltd.1 · €10.0M
- 7.Kelbuild Ltd2 · €6.3M
- 8.Kennedy's Food Store Limited4 · €6.2M
- 9.Display Contracts International Limited1 · €6.0M
- 10.McSharry TRACK Ltd.3 · €5.4M
Year-by-year
| Year | Awards | Value |
|---|---|---|
| 2013 | 28 | - |
| 2014 | 18 | - |
| 2015 | 10 | €1.1M |
| 2016 | 16 | €24.7M |
| 2017 | 29 | €65.4M |
| 2018 | 45 | €120.9M |
| 2019 | 65 | €26.0M |
| 2020 | 64 | €28.4M |
| 2021 | 73 | €32.9M |
| 2022 | 34 | €215.6M |
| 2023 | 93 | €45.0M |
| 2024 | 90 | €54.9M |
| 2025 | 83 | €45.7M |
| 2026 | 160 | €43.6M |
Track who wins Office of Public Works (OPW) contracts
Pick a company below. When it wins a new public contract, it appears in your scoped monitoring email under "Companies you watch". Watching one company is free.
TenderWatch Pro
Track this buyer's upcoming tenders and expiring contracts
Unlock the full Contract Expiry Radar (450+ contracts over EUR 100k ending in the next 6 months), weekly matched tender alerts, and one-click CSV exports. EUR 49 a month, cancel any time.
See TenderWatch ProBy value band
- Under €25k4 · €66k
- €25k-€50k13 · €498k
- €50k-€144k116 · €11.7M
- €144k-€360k132 · €30.0M
- €360k-€1M99 · €59.4M
- €1M-€5M52 · €99.8M
- Over €5M35 · €502.7M
Competition intensity
- Awards with bid data
- 613
- Sole bidder (no competition)
- 161
- Most contested award
- Establishment of a Multi-Party Framework Agreement for Small Building Works in 8 (Eight) Regional Lots.
- 166 bids received
Least contested above 1 bid: LAN speed WAN connectivity between the Blaskets Centre (2 bids)
By procedure
- Direct Invite – Mini-Competition: 24
- Open Procedure: 628
- Restricted Procedure: 32
- Simplified: 1
- Competitive Procedure With Negotiation: 1
- Direct Invite – Quick Quote: 3
Supplier intelligence
Top-3 suppliers account for 60% of €2.2bn total disclosed value, a market-concentration signal.
| Supplier | Share | CRO status | Other bodies (join 4) |
|---|---|---|---|
| Alan Hart Construction Services ltd | 45.5% | Normal | also won €1.0M across 1 other Irish body → |
| P.J. Hegarty and Sons (Dublin) - aka PJ Hegarty | 8.2% | - | also won Not disclosed across 2 other Irish bodies → |
| Sensori Facilities Management Limited | 6.4% | Normal | also won €16.9M across 5 other Irish bodies → |
| Flynn Management and Contractors | 1.8% | - | also won €154.2M across 6 other Irish bodies → |
| Arup | 1% | - | also won €290.0M across 35 other Irish bodies |
Repeat winners
Suppliers awarded contracts by Office of Public Works (OPW) in two or more separate years, from published award notices.
| Supplier | Awards | Active years |
|---|---|---|
| Murphy Geospatial Ltd (A Woolpert Company) | 14 | 2020, 2022, 2023, 2024, 2025, 2026 |
| Philip P McCormack (Plant) Ltd | 13 | 2018, 2019, 2020, 2021, 2023, 2024, 2025, 2026 |
| JBA Consulting Engineers and Scientists | 11 | 2016, 2018, 2019, 2020, 2022, 2025, 2026 |
| Bluesky International Ltd | 8 | 2021, 2022, 2023, 2025, 2026 |
| FJS Plant Repairs Ltd | 8 | 2023, 2024, 2025, 2026 |
| Aramark | 7 | 2021, 2023 |
| J H Fitzpatrick Ltd | 7 | 2021, 2022, 2023, 2024, 2026 |
| MacHale Plant Hire Ltd | 7 | 2017, 2019, 2020, 2023 |
| Ardfert Quarry Products | 6 | 2017, 2019, 2020, 2021, 2022 |
| Quest Systems | 6 | 2024, 2025, 2026 |
| Ward Personnel Limited | 6 | 2025, 2026 |
| Arup | 4 | 2017, 2023, 2025, 2026 |
| Ayesa (formerly ByrneLooby) | 4 | 2021, 2023, 2025, 2026 |
| BDP | 4 | 2025, 2026 |
| D.M Morris Ltd | 4 | 2025, 2026 |
| Ideagen Ltd | 4 | 2024, 2026 |
| Kennedy's Food Store Limited | 4 | 2023, 2024, 2026 |
| Mythen Construction Ltd | 4 | 2014, 2024, 2025, 2026 |
| NVM Limited | 4 | 2016, 2018, 2019, 2020 |
| Suirside Construction LTD | 4 | 2023, 2024, 2026 |
| TBF THOMPSON (GARVAGH) LTD t/a TBF CONSTRUCTION MACHINERY | 4 | 2020, 2021, 2023 |
| TOBIN Consulting Engineers | 4 | 2023, 2025, 2026 |
| APEM Limited | 3 | 2024, 2026 |
| Armstrong Machinery Ltd | 3 | 2019, 2020 |
| Carron + Walsh Construction Consultants Ltd | 3 | 2017, 2023 |
| Cunningham Civil and Marine Ltd | 3 | 2021, 2023 |
| ECI JCB | 3 | 2019, 2020, 2024 |
| EcoQuest Environmental | 3 | 2020, 2022, 2025 |
| EMS | 3 | 2020, 2021, 2025 |
| First Up Slu | 3 | 2024, 2026 |
| Flynn Management and Contractors | 3 | 2021, 2024, 2026 |
| Frank C Murray and Sons Construction Ltd | 3 | 2018, 2023, 2026 |
| Jacobs Engineering Ireland Ltd | 3 | 2021, 2023, 2024 |
| Joseph Mc Menamin and Son (Stranorlar) Ltd. | 3 | 2024, 2026 |
| MangoApps Inc. | 3 | 2020, 2026 |
| McFarland Consulting Ltd | 3 | 2021, 2026 |
| McSharry TRACK Ltd. | 3 | 2019, 2020, 2022 |
| Michael F. Quirke and Sons | 3 | 2017, 2021, 2022 |
| Stephen Byrne Plant Hire and Civil Engineering Contractors | 3 | 2019, 2023, 2024 |
| The Information Lab | 3 | 2020, 2026 |
| Xylem Analytics UK Ltd | 3 | 2016, 2017, 2021 |
| A2 Architects | 2 | 2025, 2026 |
| Alastair Coey Architects | 2 | 2025, 2026 |
| arcana productions ltd | 2 | 2019, 2024 |
| Ashbourne Truck Centre | 2 | 2016, 2023 |
| AVRIO Environmental Management | 2 | 2023, 2026 |
| Brambles | 2 | 2022, 2024 |
| BSF Swissphoto GmbH | 2 | 2022, 2023 |
| C.BURKE CONTRACTS LTD | 2 | 2025, 2026 |
| Campion Pumps | 2 | 2024, 2025 |
| Causeway Geotech Ltd | 2 | 2021, 2024 |
| Cimolai Ireland LTD | 2 | 2024, 2026 |
| Corribview Safety Services Ltd. | 2 | 2019, 2025 |
| Creighan Contracts Limited | 2 | 2025, 2026 |
| Custy Construction LImited | 2 | 2023, 2024 |
| DAF Distributors Ireland | 2 | 2019, 2020 |
| Desmond Rogers | 2 | 2019, 2025 |
| Doka Ireland Formwork Technologies Ltd. | 2 | 2021, 2024 |
| DRA Consulting Engineers | 2 | 2023, 2026 |
| Dublin Grass Machinery | 2 | 2021, 2025 |
| Elite Woodworking Machinery | 2 | 2023, 2024 |
| gannon and mcnamara electrical contractors ltd | 2 | 2025, 2026 |
| Gort na Vogue Ltd. | 2 | 2020, 2025 |
| Grosvenor Services | 2 | 2023, 2025 |
| Harris Retail Unlimited Company | 2 | 2021, 2025 |
| HG Construction (Ireland) Ltd. | 2 | 2025, 2026 |
| Hydrographic Surveys Ltd. | 2 | 2022, 2024 |
| IBM Ireland | 2 | 2024, 2026 |
| Integrated Environmental Solutions | 2 | 2025, 2026 |
| Irish Tar | 2 | 2017, 2023 |
| JMG Solutions Ltd | 2 | 2021, 2024 |
| John Sisk and Son (Holdings) Ltd | 2 | 2024, 2026 |
| John Spollen(Glasson) Ltd. | 2 | 2023, 2025 |
| Keegan Quarries Ltd | 2 | 2019, 2023 |
| Kelbuild Ltd | 2 | 2025, 2026 |
| Kenaidan Contractors Ltd | 2 | 2025, 2026 |
| Logicalis Technology Ltd | 2 | 2020, 2021 |
| Lynch Trailers | 2 | 2019, 2021 |
| MICHAEL CRONIN SAND and GRAVEL LTD | 2 | 2019, 2020 |
| Michael J Walshe and Co Ltd | 2 | 2025, 2026 |
| MPA Consulting Engineers | 2 | 2025, 2026 |
| O'Connor Sutton Cronin | 2 | 2023, 2024 |
| O'Donnell Environmental Ltd. | 2 | 2025, 2026 |
| P.J. Hegarty and Sons (Dublin) - aka PJ Hegarty | 2 | 2021, 2025 |
| palfinger ireland limited | 2 | 2019, 2020 |
| Penhouse Design | 2 | 2020, 2024 |
| Priority Geotechnical Limited | 2 | 2017, 2019 |
| Setanta Vehicle Importers Ltd | 2 | 2024, 2026 |
| SKS Communications Ltd | 2 | 2025, 2026 |
| Terence Ponsonby Limited | 2 | 2024, 2025 |
| Tetra Tech Consulting Ltd | 2 | 2024, 2025 |
| Triangle Technology Services Limited | 2 | 2025, 2026 |
| TRIUR Construction Limited | 2 | 2022, 2023 |
| TRIWORX SOFTARE SERVICES LTD | 2 | 2024, 2026 |
| Versaffix Ltd. | 2 | 2025, 2026 |
| Volkswagen Group Ireland Ltd | 2 | 2020, 2026 |
| WH Scott and Son Engineers | 2 | 2021, 2024 |
| Winroy Ltd | 2 | 2025, 2026 |
Notices published in the last 90 days
Export 808 awarded contracts (CSV & JSON)
TenderWatch ProAward history (808 records)
| Date | Title | Winner | Bids | Procedure | Value |
|---|---|---|---|---|---|
| 16 October 2026 | Façade and Building Envelope Engineering Consultancy Services for The Refurbishment, Fitout and Historic Building Retrofit of Áras Mhic Dhiarmada, Store St, Beresford Place, Dublin 1 | undisclosed | - | - | |
| 16 October 2026 | Construction Programme Analyst for proposed 14 storey Office Building at Bank Place, Opera Square, Limerick | undisclosed | - | - | |
| 16 October 2026 | Conservation Architect consultancy services for The Refurbishment, Fitout and Historic Building Retrofit of Áras Mhic Dhiarmada/Busáras, Store St, Beresford Place, Dublin 1 | undisclosed | - | - | |
| 7 October 2026 | Department of Defence Head Office, Station Road, Newbridge, B8492 230001 | undisclosed | - | - | |
| 5 October 2026 | Quantity Surveying Professional Consultancy Services for Aquatic House Complex, National Botanic Gardens, Glasnevin, Dublin 9 | undisclosed | - | - | |
| 5 October 2026 | Project Opera, Bank Place, Limerick City - Provision of Civil and Structural Resident Engineering Services | undisclosed | - | - | |
| 5 October 2026 | Civil and Structural, and Building Envelope and Façade Design Professional Consultancy tender for the restoration and redevelopment of the Aquatic House Complex National Botanic Gardens | undisclosed | - | - | |
| 5 October 2026 | The Provision of Mechanical and Electrical Resident Monitoring Engineering Services (Chartered) for Project Opera, Bank Place Limerick City , Co.Limerick | undisclosed | - | - | |
| 5 October 2026 | Roof Refurbishment at Doolin Coastguard Station, Ballaghaline, Doolin, Co. Clare. | undisclosed | - | €134k | |
| 5 October 2026 | Appointment of Mechanical and Electrical Consulting Engineer for The Refurbishment, Fit-out and Historic Building Retrofit of ÁRAS MHIC DHIARMADA Store St, Beresford Place, Dublin 1 | undisclosed | - | - | |
| 5 October 2026 | BIM Consultancy Services for the Aquatic House Complex, National Botanic Gardens, Glasnevin, Dublin 9 | undisclosed | - | - | |
| 2 October 2026 | Appcheck Licence renewal | undisclosed | - | €60k | |
| 2 October 2026 | The Renewal of Asana Enterprise Licenses | undisclosed | - | €135k | |
| 2 October 2026 | Request for Tenders dated 3/5/2024 for the provision of Palo Alto Licensing, Services and Support | undisclosed | - | €750k | |
| 2 October 2026 | Renewal of DUO Security subscription | undisclosed | - | €250k | |
| 2 October 2026 | Mobile Device Managed Services | undisclosed | - | €200k | |
| 29 September 2026 | CFT for 4WD Panel Vans with Payload Volume in Range 9m³ to 10.5m (up to 3 units) | undisclosed | - | €200k | |
| 25 September 2026 | Van Derived 4WD Single Cab Drop Side | undisclosed | - | €130k | |
| 25 September 2026 | Request for Applicants to Participate in a Dynamic Purchasing System (DPS) for the provision of Site Engineer Services for Arterial Drainage Maintenance and Construction Services for the OPW | undisclosed | - | €200k | |
| 24 September 2026 | DPS Mini Competition of the Provision of Site Engineer Services based at the Ballina Depot, Ballina, Co. Mayo | Ward Personnel Limited | - | Direct Invite – Mini-Competition | - |
| 23 September 2026 | Civil and Structural Consultancy Services for The Refurbishment, Fitout and Historic Building Retrofit of Áras Mhic Dhiarmada/Busáras, Store St, Beresford Place, Dublin | Arup | - | - | |
| 23 September 2026 | Measured Topographic and Building Geo-Surveys for Áras Mhic Dhiarmada / Busáras, Store Street, Dublin 1, D01 WY03 | Murphy Geospatial Ltd (A Woolpert Company) | - | - | |
| 16 September 2026 | Request for Tender for the provision of On-site Environmental Audits for the Annual Arterial Drainage Maintenance Programme for the OPW | undisclosed | - | €165k | |
| 8 September 2026 | B8207 / 21 0001 / Roscrea Civil Defence - Roof Refurbishment and Universal Access Reception. | Frank C Murray and Sons Construction Ltd | - | Direct Invite – Mini-Competition | - |
| 8 September 2026 | Renewal of Secure Email Gateway Environment | Triangle Technology Services Limited | - | €110k | |
| 7 September 2026 | Renewal of existing 510 Mail Manager licenses with Maintenance. | Ideagen Ltd | - | €130k | |
| 4 September 2026 | Geomatic Survey Services; Measured Topographic and Building Surveys for the National Museum of Ireland Archaeology | Murphy Geospatial Ltd (A Woolpert Company) | - | €350k | |
| 3 September 2026 | Support, Maintenance and Further Development of an Integrated Workplace Management System - Tririga | IBM Ireland | - | €800k | |
| 3 September 2026 | Web and Mobile Application Development Expertise to Extend the Functionality of an Integrated Workplace Management System (Tririga) | TRIWORX SOFTARE SERVICES LTD | - | €240k | |
| 1 September 2026 | RFT for Standard Notebook, Standard CAD Notebook and High Spec CAD Notebook | Dell Technologies | - | €400k | |
| 1 September 2026 | RFT for Hydraulically Driven Forestry Mulching Head For 14 Tonne Excavator (up to 6 units) | Philip P McCormack (Plant) Ltd | - | €156k | |
| 31 August 2026 | Managed Mobility Services for Mobile Devices and SIM Cards incorporating Device as a Service (DaaS) | undisclosed | - | €200k | |
| 31 August 2026 | RFT for Standard Notebook, Standard CAD Notebook and High Spec CAD Notebook | undisclosed | - | €400k | |
| 31 August 2026 | Asana Enterprise Licence Renewal | Asana Inc | - | €76k | |
| 28 August 2026 | Athlone Flood Alleviation Scheme - Deerpark - Bastion Quay Cladding | First Up Slu | - | €240k | |
| 28 August 2026 | The Establishment of Multiparty Framework For Building Maintenance Services and General Building Works in the Dublin Region | Sensori Facilities Management Limited | - | €140.0M | |
| 28 August 2026 | Landscape Maintenance at the Battle of the Boyne Visitor Centre, Oldbridge, Co Meath | Porscul Ltd | - | €120k | |
| 21 August 2026 | Renewal of NBS Chorus Premium licences.. | undisclosed | - | €80k | |
| 21 August 2026 | Renewal of 175 Asana Enterprise licences | undisclosed | - | €130k | |
| 21 August 2026 | Single Supply Contract for Sash Window Restoration Works at Goresbridge Garda Station, Co. Kilkenny | Smyth Building Contractors | - | €50k | |
| 17 August 2026 | CFT for Architect Led Integrated Design Team Services for the Redevelopment of the Crawford Art Gallery and surrounding Public Realm for CWMF Stage 4 (Construction) and Stage 5 (Handover) | Grafton Architects | - | €4.5M | |
| 17 August 2026 | CTF for the provision of Archaeology Services for proposed new Visitor Facility at 8 9 Moore Lane, Dublin. | Deery Heritage Consultancy Ltd | - | €35k | |
| 17 August 2026 | CFT Hygrothermal Consultancy Services Trim Market House | Passivate Energy and Sustainability Limited | - | €39k | |
| 14 August 2026 | 135 Bluebeam Revu to Complete Licenses with Maintenance | Brighter Graphics | - | €34k | |
| 13 August 2026 | Accessible Entrance and Lobby Works at DSP, Block 1, Government Offices, Hebron Road, Kilkenny. | Donal Corrigan Construction Ltd | - | €140k | |
| 12 August 2026 | RFT for Renewal of OPW Existing AutoDesk Subscription | undisclosed | - | €3.5M | |
| 12 August 2026 | Renewal of OPW Existing AutoDesk Subscription | NTI Digital Solutions Ireland Ltd | - | €3.5M | |
| 12 August 2026 | Project Management Service for the deployment of FlexManager stores and asset management solution | CGA Software Ltd | - | €160k | |
| 6 August 2026 | Servicing and Maintenance of Off Grid Toilet Facilities at Phoenix Park, Dublin 8 | DCS Services Ltd | - | - | |
| 6 August 2026 | Department of Social Protection – Dunfanaghy - Office Fit-Out | Joseph Mc Menamin and Son (Stranorlar) Ltd. | - | - | |
| 6 August 2026 | Custom House Waterford Roof Repairs | Suirside Construction LTD | - | - | |
| 31 July 2026 | Hydraulic Tiltrotators (3 Lots) | Versaffix Ltd. | - | €290k | |
| 30 July 2026 | Hydraulic Excavators in 2 Lots | FJS Plant Repairs Ltd | - | €250k | |
| 29 July 2026 | Road and Path Reconstruction and ancillary works, Ashtown Demesne, Phoenix Park, Dublin 8. | D.M Morris Ltd | - | - | |
| 28 July 2026 | Audio Visual and Interactive Content and Hardware for Roscrea Castle and Damer House, Tipperary | Audionation UK | - | €300k | |
| 27 July 2026 | The provision of Exhibition Fitout, Graphics and Signage (production and installation) for Roscrea Castle and Damer House, County Tipperary | Marcon Fit Out Ireland | - | €850k | |
| 27 July 2026 | Concept and Feasibility Study for the Development of Emo Court and Estate as a Tourism Hub | Carmody Groarke | - | €150k | |
| 27 July 2026 | Audio Visual and Interactive Content and Hardware for the Clonmacnoise Monastic Site Visitor Centre, Co. Offaly | Thought Different | - | €350k | |
| 27 July 2026 | Supply of projectors, lenses, screens, and suitable flight cases for installation in Bedford Hall, Castle Hall, and Saint Patricks Hall in Dublin Castle. | Creative Technology (Audio Visual) Ireland Ltd | - | €111k | |
| 24 July 2026 | ECOLOGICAL SERVICES (Bats) | O'Donnell Environmental Ltd. | - | - | |
| 22 July 2026 | Entrance Road Reconstruction and Ancillary Works, Whitefields Depot, Phoenix Park | D.M Morris Ltd | - | - | |
| 22 July 2026 | Tender for the provision of soft landscaping and maintenance programme Farmleigh House and Estate, OPW, Dublin 15 | MCR Group | - | €80k | |
| 21 July 2026 | A FRAMEWORK OF SPECIALIST SERVICE PROVIDERS FOR THE AWARD OF SERVICES CONTRACTS SERVING A STATEWIDE ENERGY CONSERVATION INITIATIVE IN CENTRAL GOVERNMENT AND PUBLIC SECTOR BUILDINGS | undisclosed | - | €2.0M | |
| 13 July 2026 | Topographic Survey Services for the Ennis Scheme Study Area Hydraulic Model | Murphy Geospatial Ltd (A Woolpert Company) | 1 | Open Procedure | €70k |
| 13 July 2026 | Ground Floor fit out for the new Policing and Community Safety Authority (PCSA) at 90 North King Street, Smithfield, Dublin 7 | Creighan Contracts Limited | - | - | |
| 10 July 2026 | Islandbridge Commemorative Bridge- Main Contractor | John Sisk and Son (Holdings) Ltd | - | - | |
| 10 July 2026 | Supply of commercial TV monitors, stands, brackets and suitable flight cases for installation in lobbies and conference rooms in Dublin Castle | Quest Systems | - | €61k | |
| 10 July 2026 | Business Case for commercially sensitive property purchase | KPMG | - | €49k | |
| 9 July 2026 | Supply and delivery of 56kW (75H.P) 4-WD Tractor | FJS Plant Repairs Ltd | - | €240k | |
| 7 July 2026 | Lot 1 Major Schemes - National (all OPW regions) | JBA Consulting Engineers and Scientists | - | €3.4M | |
| 2 July 2026 | Belmullet Garda Station | Kenaidan Contractors Ltd | - | - | |
| 1 July 2026 | Supply of Two Way Portable Radios and Associated Equipment for Dublin Castle and Farmleigh | Sigma Wireless Communications | - | €150k | |
| 1 July 2026 | Request for Applicants to Participate in a Dynamic Purchasing System (DPS) for the Provision of Construction Site Staff Services for Arterial Drainage Maintenance and Construction Services for OPW | Crewit Resourcing Ltd. | - | - | |
| 30 June 2026 | Provision of Construction Site Staff covering Co. Clare and Co. Limerick | Crewit Resourcing Ltd. | - | Direct Invite – Mini-Competition | - |
| 30 June 2026 | Mallow Court House - Roof, Building Fabric Upgrade and Associated works | HG Construction (Ireland) Ltd. | - | - | |
| 18 June 2026 | RFT for the provision of Portlaoise Rivers Manhole and CCTV Survey for the Office of Public Works | Environmental Techniques | - | €90k | |
| 16 June 2026 | Van Derived 4WD Single Cab Drop Side | O'Reilly Commercials Limited | 1 | Open Procedure | €130k |
| 12 June 2026 | CFT for 4WD Panel Vans with Payload Volume in Range 9m³ to 10.5m (up to 3 units) | Volkswagen Group Ireland Ltd | 3 | Open Procedure | €200k |
| 12 June 2026 | The purchase of Electric 4-WD Utility Terrain Vehicle | undisclosed | - | €500k | |
| 11 June 2026 | Clonmel District Headquarters GS - Civil and Structural Engineering Consultancy Services | DRA Consulting Engineers | - | - | |
| 9 June 2026 | Provision of Cafe at Castletown House, Celbridge, Co. Kildare | Kennedy's Food Store Limited | - | - | |
| 9 June 2026 | Request for Tender for the provision of Flood Map Update - Bundle II | JBA Consulting Engineers and Scientists | - | €275k | |
| 4 June 2026 | Invasive Species Treatment Lower Lee and Blackpool flood relief schemes | JKI Environmental Ltd | - | €100k | |
| 1 June 2026 | Tableau Tender January 2026 | The Information Lab | - | €670k | |
| 29 May 2026 | RFT for Hydraulically Driven Forestry Mulching Head For 14 Tonne Excavator (up to 6 units) | Philip P McCormack (Plant) Ltd | 3 | Open Procedure | €156k |
| 26 May 2026 | Request for Tender for the provision of OPW Baseline Biodiversity Studies with Recommendations at Ten Historic Sites Countrywide 2025 | JBA Consulting Engineers and Scientists | - | - | |
| 21 May 2026 | RFT for the Artificial Drainage Channel Categorisation Project | Ecology Research and Solutions Limited | 1 | Open Procedure | €80k |
| 20 May 2026 | Supply of Weed Cutting Boat | Hemos Machinebouw BV | - | €165k | |
| 19 May 2026 | Landscape Maintenance at the Battle of the Boyne Visitor Centre, Oldbridge, Co Meath | Porscul Ltd | 1 | Open Procedure | €120k |
| 18 May 2026 | Project Management Service for the deployment of FlexManager stores and asset management solution | CGA Software Ltd | 1 | Open Procedure | €160k |
| 18 May 2026 | National Coastal Oblique Imagery Survey 2026 | APEM Limited | - | €425k | |
| 15 May 2026 | MangoApps Licence Renewal | MangoApps Inc. | - | €700k | |
| 11 May 2026 | Surveying Services for Clonmel, Carrick-on-Suir, New Ross and Carlow Town SCCAP Channel Survey | Murphy Geospatial Ltd (A Woolpert Company) | 2 | Open Procedure | €125k |
| 30 April 2026 | Supply and delivery of 56kW (75H.P) 4-WD Tractor | FJS Plant Repairs Ltd | 4 | Open Procedure | €240k |
| 30 April 2026 | Athlone Flood Alleviation Scheme - Deerpark - Bastion Quay Cladding | First Up Slu | 2 | Open Procedure | - |
| 29 April 2026 | Provision of Environmental Consultancy Services for Boyne River Arterial Drainage Scheme | AVRIO Environmental Management | - | Direct Invite – Mini-Competition | - |
| 24 April 2026 | Mini Competition for Site Engineer Services at the East Region Drainage Maintenance | Ward Personnel Limited | - | €160k | |
| 23 April 2026 | Invasive Species Treatment Lower Lee and Blackpool flood relief schemes | JKI Environmental Ltd | 1 | Open Procedure | €100k |
| 23 April 2026 | Resident Mechanical and Electrical Engineering Services - Portlaoise Garda Divisional Headquarters | Fusion 4 Quality | - | - | |
| 23 April 2026 | National Concert Hall Complex Redevelopment - Cathodic Protection Specialist Designer | McFarland Consulting Ltd | - | - | |
| 22 April 2026 | The provision of Interpretation and Exhibition Design for Roscrea Castle and Damer House | Imagemakers Design & Consultancy Ltd | - | €750k | |
| 22 April 2026 | Gorey Garda Station Cell Upgrade and Prisoner Processing Unit works | Mythen Construction Ltd | - | - | |
| 17 April 2026 | The provision of Professional Services at Clonmacnoise Monastic Site, Co. Offaly. | David Byrne Architects | - | €850k | |
| 16 April 2026 | The provision of Programme Coordination and Advisory Services to the Office of Public Works | The Tourism Company Ltd | - | €1.0M | |
| 16 April 2026 | Provision of Professional Services within an Integrated, Multi-disciplinary team at the “Corlea Trackway Visitor Centre” for the OPW | Hall McKnight Architects | - | €239k | |
| 16 April 2026 | National Concert Hall Complex - Landscape Architect Consultancy Services | BDP | - | - | |
| 15 April 2026 | Tender for the provision of soft landscaping and maintenance programme Farmleigh House and Estate, OPW, Dublin 15 | MCR Group | 4 | Open Procedure | €80k |
| 15 April 2026 | Civil and Structural Engineering Consultancy Service and Project Supervisor Design Process (PSDP)Consultancy Service, Naas Garda Station | MPA Consulting Engineers | - | €35k | |
| 13 April 2026 | Provision of Tearoom Services at Garinish Island, Glengarriff, County Cork | Glengarriff Seafood Consultancy Limited | - | - | |
| 7 April 2026 | Building Maintenance Unit - Landscaping Services at Tyrone Guthrie | C.BURKE CONTRACTS LTD | - | €240k | |
| 2 April 2026 | Provision of official passenger and cargo transportation to Sceilg Mhichíl, Co. Kerry 2026 season | Murphy Sea Cruises Ltd | - | €90k | |
| 1 April 2026 | Servicing and Maintenance of Off Grid Toilet Facilities at Phoenix Park, Dublin 8 | DCS Services Ltd | 2 | Open Procedure | - |
| 1 April 2026 | Supply of AV and Media Equipment for use in the Hibernia and Printworks Conference Centres at Dublin Castle for the EU Presidency 2026 | Quest Systems | - | €325k | |
| 27 March 2026 | Provision of services to develop a Visitor Experience Plan and design of enhanced Wayfinding and Interpretation at Scattery Island in County Clare | undisclosed | - | €300k | |
| 26 March 2026 | Renewal of 8X8 licences and optional additional functional requirements | 8x8 UK Limited | - | €720k | |
| 25 March 2026 | Assigned Certifier Services - New Build Storage Facility, Tallaght Garda Station | TOBIN Consulting Engineers | - | €19k | |
| 24 March 2026 | Entrance Road Reconstruction and Ancillary Works, Whitefields Depot, Phoenix Park | D.M Morris Ltd | 8 | Open Procedure | - |
| 24 March 2026 | The provision of Architectural Landscape Design Services Roscrea Castle and Gardens at Roscrea Castle, Gardens and Damer House | Dermot Foley Landscape Architects | - | €250k | |
| 23 March 2026 | Technical Engineering Consultancy Services for the Ennis Scheme Study Area Hydraulic Model | Arup | - | €300k | |
| 20 March 2026 | related services – Mini Competition for the Provision of a Site Construction Staff in Co. Kerry | Crewit Resourcing Ltd. | - | €160k | |
| 19 March 2026 | Mini Competition for the Provision of a Site Construction Staff in Co. Kerry | Crewit Resourcing Ltd. | - | Direct Invite – Mini-Competition | - |
| 17 March 2026 | Sligo Garda Station Internal Alterations | gannon and mcnamara electrical contractors ltd | - | - | |
| 13 March 2026 | Clonmacnoise Visitor Centre Redevelopment, Clonmacnoise, Co Offaly | Kelbuild Ltd | - | €6.3M | |
| 12 March 2026 | related services – Mini Competition for the Provision of a Site Construction Staff in Co. Mayo | NexVentur Ltd | - | €90k | |
| 11 March 2026 | Mini Competition for the Provision of a Site Construction Staff in Co. Mayo | NexVentur Ltd | - | Direct Invite – Mini-Competition | - |
| 11 March 2026 | Supply of commercial TV monitors, stands, brackets and suitable flight cases for installation in lobbies and conference rooms in Dublin Castle | Quest Systems | 5 | Open Procedure | €61k |
| 11 March 2026 | Supply of projectors, lenses, screens, and suitable flight cases for installation in Bedford Hall, Castle Hall, and Saint Patricks Hall in Dublin Castle. | Creative Technology (Audio Visual) Ireland Ltd | 3 | Open Procedure | €111k |
| 11 March 2026 | Request for Tenders for the provision of Coastal Monitoring Aerial Photography and LiDAR Survey Spring 2026 | Bluesky International Ltd | - | €170k | |
| 3 March 2026 | RFT for the provision of Portlaoise Rivers Manhole and CCTV Survey for the Office of Public Works | Environmental Techniques | 6 | Open Procedure | €90k |
| 2 March 2026 | MangoApps Licence Renewal | MangoApps Inc. | 1 | Open Procedure | €700k |
| 2 March 2026 | Provision of Interpretation Systems - EU Presidency | SKS Communications Ltd | - | €995k | |
| 2 March 2026 | Tender for for Dynamic Thermal Modelling and Building Performance Simulation Software | Integrated Environmental Solutions | - | €100k | |
| 2 March 2026 | Island bridge Commemorative Bridge- Reserved Specialist | Cimolai Ireland LTD | - | - | |
| 26 February 2026 | Marine and Coastal Consultancy Services and PSDP to Prepare an Options Appraisal to Investigate Future Development Possibilities for the Landings at Great Blasket Island and Dun Chaoin Pier | Ayesa (formerly ByrneLooby) | - | €49k | |
| 24 February 2026 | LED Display services - EU Presidency 2026 | SKS Communications | - | €995k | |
| 20 February 2026 | Provision of Cafe at Castletown House, Celbridge, Co. Kildare | Kennedy's Food Store Limited | 5 | Open Procedure | - |
| 19 February 2026 | Supply of AV and Media Equipment for use in the Hibernia and Printworks Conference Centres at Dublin Castle for the EU Presidency 2026 | Quest Systems | 3 | Open Procedure | €325k |
| 18 February 2026 | Custom House Waterford Roof Repairs | Suirside Construction LTD | 2 | Open Procedure | - |
| 18 February 2026 | 111KW (150 H.P.) 4 WD Tractor with Loader | J H Fitzpatrick Ltd | - | €110k | |
| 18 February 2026 | 18 Tonne 4 x 2 Rigid Tipper Truck | Setanta Vehicle Importers Ltd | - | €700k | |
| 13 February 2026 | Renewal of existing 210 Mail Manager licenses with Maintenance. | Ideagen Ltd | - | €110k | |
| 12 February 2026 | WOC/03/25 Supply and Installation of Phone Booths | Winroy Ltd | - | €27k | |
| 11 February 2026 | National Centre for Research and Remembrance | Detail Design and Construction Delivery | Architectural Conservation Services | Alastair Coey Architects | - | - | |
| 11 February 2026 | Replacement of the modern glazed ground floor external circulation corridors and link structures at the Garda Training College, Templemore, Co. Tipperary - Architectural Servies | A2 Architects | - | - | |
| 10 February 2026 | Civil and Structural Consultancy Services for The Refurbishment, Fitout and Historic Building Retrofit of Áras Mhic Dhiarmada/Busáras, Store St, Beresford Place, Dublin | Arup | 2 | Open Procedure | - |
| 10 February 2026 | Civil and Structural Resident Engineering Services for the Macroom Garda Divisional Headquarters, Gurteenroe, Macroom, Co. Cork. | Michael J Walshe and Co Ltd | - | - | |
| 6 February 2026 | Geomatic Survey Services; Measured Topographic and Building Surveys for the National Museum of Ireland Archaeology | Murphy Geospatial Ltd (A Woolpert Company) | 4 | Open Procedure | - |
| 4 February 2026 | Mini Competition for the Provision of a Site Administrator (Works Clerk) in Listowel, Co. Kerry | Ward Personnel Limited | - | €160k | |
| 3 February 2026 | Mini Competition for the Provision of a Site Administrator (Works Clerk) in Listowel, Co. Kerry | Ward Personnel Limited | - | Direct Invite – Mini-Competition | - |
| 2 February 2026 | National Concert Hall Complex Redevelopment - Cathodic Protection Specialist Designer | McFarland Consulting Ltd | 1 | Open Procedure | - |
| 29 January 2026 | Tender for the upgrade of the Auditorium Audio-Visual system at National Botanic Gardens, Dublin 9 | Stacked Ltd | 4 | Open Procedure | €95k |
| 29 January 2026 | Renewal of existing 510 Mail Manager licenses with Maintenance. | Ideagen Ltd | 1 | Open Procedure | €130k |
| 28 January 2026 | Refurbishment and upgrade works to conferencing facilities at Printworks/Stamping Building and Hibernia Conference Centre, Dublin Castle | Flynn Management and Contractors | - | Direct Invite – Mini-Competition | - |
| 28 January 2026 | National Coastal Oblique Imagery Survey 2026 | APEM Limited | 3 | Open Procedure | €425k |
| 26 January 2026 | Department of Social Protection – Dunfanaghy - Office Fit-Out | Joseph Mc Menamin and Son (Stranorlar) Ltd. | 4 | Open Procedure | - |
| 20 January 2026 | Provision of Tearoom Services at Garinish Island, Glengarriff, County Cork | Glengarriff Seafood Consultancy Limited | 2 | Open Procedure | - |
| 19 January 2026 | Renewal of 8X8 licences and optional additional functional requirements | 8x8 UK Limited | 1 | Open Procedure | €720k |
| 16 January 2026 | Supply of Two Way Portable Radios and Associated Equipment for Dublin Castle and Farmleigh | Sigma Wireless Communications | 4 | Open Procedure | €150k |
| 12 January 2026 | Tableau Tender January 2026 | The Information Lab | 2 | Open Procedure | €670k |
| 9 January 2026 | Resident Mechanical and Electrical Engineering Services - Portlaoise Garda Divisional Headquarters | Fusion 4 Quality | 1 | Open Procedure | - |
| 23 December 2025 | Building Maintenance Unit - Landscaping Services at Tyrone Guthrie | C.BURKE CONTRACTS LTD | 5 | Open Procedure | €240k |
| 15 December 2025 | Request for Tender for the provision of On-site Environmental Audits for the Annual Arterial Drainage Maintenance Programme for the OPW | Tetra Tech Consulting Ltd | 7 | Open Procedure | €165k |
| 3 December 2025 | The Supply of Roller Blinds to Government Buildings, Farnham St., Keadew, Co. Cavan - WOC/04/25 | Classic Blinds and Interiors | 3 | Open Procedure | €30k |
| 26 November 2025 | Request for Tenders for the provision of Coastal Monitoring Aerial Photography and LiDAR Survey Spring 2026 | Bluesky International Ltd | 3 | Open Procedure | €170k |
| 25 November 2025 | Provision of ICT Research and Advisory Services | Gartner Ireland Limited | - | Direct Invite – Mini-Competition | - |
| 25 November 2025 | Provision of Firewall Solutions (Lot 2) and Associated Services. | Vodafone | - | Direct Invite – Mini-Competition | - |
| 25 November 2025 | Measured Topographic and Building Geo-Surveys for Áras Mhic Dhiarmada / Busáras, Store Street, Dublin 1, D01 WY03 | Murphy Geospatial Ltd (A Woolpert Company) | 4 | Open Procedure | - |
| 24 November 2025 | Provision of Interpretation Systems - EU Presidency | SKS Communications Ltd | 2 | Open Procedure | €995k |
| 19 November 2025 | Request for Tender for the provision of Flood Map Update - Bundle II | JBA Consulting Engineers and Scientists | 6 | Open Procedure | €275k |
| 18 November 2025 | Tender for for Dynamic Thermal Modelling and Building Performance Simulation Software | Integrated Environmental Solutions | 1 | Open Procedure | €100k |
| 12 November 2025 | OPW Survey Scope (Without PSCS Services) - Kilkenny SCCAP Channel Survey and Waterford City SCCAP Channel Survey | Murphy Geospatial Ltd (A Woolpert Company) | 1 | Open Procedure | €70k |
| 7 November 2025 | National Centre for Research and Remembrance : Detail Design and Construction Delivery : Architectural Conservation Services | Alastair Coey Architects | 3 | Open Procedure | - |
| 6 November 2025 | Hydraulic Tiltrotators (3 Lots) | Versaffix Ltd. | 6 | Open Procedure | €290k |
| 5 November 2025 | Renewal of Secure Email Gateway Environment | Triangle Technology Services Limited | 1 | Open Procedure | €110k |
| 24 October 2025 | LED Display services - EU Presidency 2026 | Quest Systems | 3 | Open Procedure | - |
| 17 October 2025 | Gorey Garda Station Cell Upgrade and Prisoner Processing Unit works | Mythen Construction Ltd | 7 | Restricted Procedure | - |
| 8 October 2025 | TENDER FOR ECOLOGICAL SERVICES AND MONITORING AT EMO COURT Co Laois. SCOPE OF SERVICES – ECOLOGICAL SERVICES (Bats) | O'Donnell Environmental Ltd. | 7 | Open Procedure | - |
| 2 October 2025 | River Deel (Crossmolina) Flood Relief Scheme - Work Package B - Mullenmore Bridge Piling Works | PJ Edwards and Company Limited | 2 | Open Procedure | - |
| 29 September 2025 | Clonmacnoise Visitor Centre Redevelopment, Clonmacnoise, Co Offaly | Kelbuild Ltd | 3 | Open Procedure | - |
| 29 September 2025 | Civil and Structural Engineering Consultancy Service and Project Supervisor Design Process (PSDP)Consultancy Service, Naas Garda Station | MPA Consulting Engineers | 4 | Open Procedure | - |
| 25 September 2025 | ISO Quality and Health and Safety Auditing and Advisory Services for OPW Arterial Drainage Maintenance and Construction Services | Quadra Ltd | 4 | Open Procedure | €104k |
| 23 September 2025 | Supplementary Request for Tenders for the Provision of Cleaning Services for OPW Facilities and Events Management Unit at Dublin Castle | Grosvenor Services | - | Direct Invite – Mini-Competition | - |
| 23 September 2025 | One 4x4 Battery Electric Crew Cab Pickup | Harris Retail Unlimited Company | 1 | Open Procedure | - |
| 11 September 2025 | The Establishment of Multiparty Framework For Building Maintenance Services and General Building Works in the Dublin Region | P.J. Hegarty and Sons (Dublin) - aka PJ Hegarty | 5 | Open Procedure | €140.0M |
| 11 September 2025 | Hydrometry Training | JBA Consulting Engineers and Scientists | 2 | Open Procedure | €75k |
| 10 September 2025 | 4-WD One Tonne High Tipping Articulated Dumper (up to 3 units) | EMS | 3 | Open Procedure | €86k |
| 22 August 2025 | Provision of a GIS Specialist in the Office of Public Works | Mallon Technology Limited | 9 | Open Procedure | €67k |
| 20 August 2025 | Civil and Structural Resident Engineering Services for the Macroom Garda Divisional Headquarters, Gurteenroe, Macroom, Co. Cork. | Michael J Walshe and Co Ltd | 1 | Open Procedure | - |
| 19 August 2025 | National Centre for Research and Remembrance : Sub-Element D: Social Housing – Detail Design and Construction Delivery : Architectural Services | Sean Harrington Architects | 5 | Open Procedure | - |
| 19 August 2025 | National Centre for Research and Remembrance : Sub-Element B: Educational Facility – Detail Design and Construction Delivery : Architectural Services | BDP | 4 | Open Procedure | - |
| 15 August 2025 | Assigned Certifier Services - New Build Storage Facility, Tallaght Garda Station | TOBIN Consulting Engineers | 7 | Open Procedure | - |
| 7 August 2025 | Architectural Services (Stages (iv) to (v) - Construction and Handover of Works) including Assigned Certifier for the Macroom Garda Divisional Headquarters, Gurteenroe, Macroom, Co. Cork. | Pascall+Watson | 2 | Open Procedure | - |
| 5 August 2025 | Mallow Court House - Roof, Building Fabric Upgrade and Associated works | HG Construction (Ireland) Ltd. | 5 | Restricted Procedure | - |
| 5 August 2025 | Replacement of the modern glazed ground floor external circulation corridors and link structures at the Garda Training College, Templemore, Co. Tipperary - Architectural Servies | A2 Architects | 2 | Open Procedure | - |
| 30 July 2025 | Technical Engineering Consultancy Services for the Ennis Scheme Study Area Hydraulic Model | Arup | 6 | Open Procedure | €300k |
| 25 July 2025 | Commerical cleaning services and exterior cleaning services at Custom House Visitor Centre, Dublin 1 | Ailesbury Services | - | Direct Invite – Mini-Competition | - |
| 21 July 2025 | Request for tenders for the Supply of and delivery to the Office of Public Works of Desktop Embossing Seals for use in Polling Stations for the validation of Ballot Papers | undisclosed | 3 | Open Procedure | €200k |
| 18 July 2025 | 6x4 Heavy Haulage Tractor Unit (up to 1 unit) | Westward Scania | 1 | Open Procedure | - |
| 18 July 2025 | 26 Tonne 6x2 Rigid Tipper Trucks (up to 3 units) | Westward Scania | 4 | Open Procedure | - |
| 17 July 2025 | Sligo Garda Station Internal Alterations | gannon and mcnamara electrical contractors ltd | 7 | Restricted Procedure | - |
| 11 July 2025 | Hydraulically Driven Forestry Mulching Head For 14 Tonne Excavator (up to 4 – 6 units) | Philip P McCormack (Plant) Ltd | 4 | Open Procedure | €120k |
| 9 July 2025 | Mid Mounted Tractor Mowers and 27.5kW/37HP Compact Tractors | FJS Plant Repairs Ltd | 5 | Open Procedure | €200k |
| 8 July 2025 | Zero Turn Mowers | Gort na Vogue Ltd. | 4 | Open Procedure | €200k |
| 25 June 2025 | Acoustic Doppler Current Profilers | Flux Enviro Ltd | 2 | Open Procedure | €300k |
| 20 June 2025 | WOC/06/24 The Supply and Installation of Desking, Pedestals and Storage Units | Farrell Furniture | 1 | Open Procedure | €17.0M |
| 19 June 2025 | Mailmeter Tender June 2025 | Waterford Technologies | 1 | Open Procedure | €300k |
| 17 June 2025 | Provision of Coastal Monitoring LiDAR Survey Autumn 2025 | Bluesky International Ltd | 5 | Open Procedure | €110k |
| 17 June 2025 | National Concert Hall Complex - Landscape Architect Consultancy Services | BDP | 5 | Open Procedure | - |
| 11 June 2025 | The Supply and Deliery of 40kW (54 H.P.) 4WD Fairway Mower in 2 Lots | Dublin Grass Machinery | 2 | Open Procedure | €200k |
| 11 June 2025 | National Centre for Research and Remembrance - Project Archaeologist | Irish Archaeological Consultancy Ltd | 2 | Open Procedure | - |
| 9 June 2025 | Athlone SEC Building Fabric Upgrade | Emerald Eco Homes | 6 | Open Procedure | - |
| 5 June 2025 | B395124 0003Letterkenny Auto Enrolment Fit-Out | Terence Ponsonby Limited | 2 | Open Procedure | - |
| 5 June 2025 | Marine and Coastal Consultancy Services and PSDP to Prepare an Options Appraisal to Investigate Future Development Possibilities for the Landings at Great Blasket Island and Dun Chaoin Pier | Ayesa (formerly ByrneLooby) | 5 | Open Procedure | - |
| 4 June 2025 | WOC/03/25 Supply and Installation of Phone Booths | Winroy Ltd | 5 | Open Procedure | €27k |
| 3 June 2025 | Training On Disability Access Certificate Auditing/Review | O'Herlihy Access Consultancy | 2 | Open Procedure | €15k |
| 2 June 2025 | National Centre for Research and Remembrance - BIM Consultancy and 3D Modelling Services | Turner and Townsend Ltd | 7 | Open Procedure | - |
| 29 May 2025 | Site Safety Inspections and Audits in the South West Region | Corribview Safety Services Ltd. | 8 | Open Procedure | €90k |
| 27 May 2025 | National Concert Hall Complex - Mechanical and Electrical Consultancy Services | BDP | 7 | Open Procedure | - |
| 27 May 2025 | Pump Station Control Panel Replacement, Blackstone, Co Wexford | Campion Pumps | 2 | Open Procedure | €60k |
| 26 May 2025 | B8351230001 RSA Driving Centre at Davis Street Government Offices Murgasty Co Tipperary | Roman Construction ltd. | 4 | Open Procedure | - |
| 23 May 2025 | Belmullet Garda Station | Kenaidan Contractors Ltd | 3 | Restricted Procedure | - |
| 6 May 2025 | Ground Floor fit out for the new Policing and Community Safety Authority (PCSA) at 90 North King Street, Smithfield, Dublin 7 | Creighan Contracts Limited | 10 | Open Procedure | - |
| 29 April 2025 | National Concert Hall Complex - Facade Consultancy Services | Murphy Facade Studio Limited | 2 | Open Procedure | - |
| 24 April 2025 | Fabric Upgrade Works at Granard Garda Station, Co Longford | Sandar Construction | 5 | Open Procedure | - |
| 24 April 2025 | Road and Path Reconstruction and ancillary works, Ashtown Demesne, Phoenix Park, Dublin 8. | D.M Morris Ltd | 13 | Open Procedure | €500k |
| 10 April 2025 | Request for Tender for the provision of OPW Baseline Biodiversity Studies with Recommendations at Ten Historic Sites Countrywide 2025 | JBA Consulting Engineers and Scientists | 16 | Open Procedure | - |
| 7 April 2025 | Provision of Environmental Clerk of Works Service | EcoQuest Environmental | 6 | Open Procedure | €300k |
| 31 March 2025 | Operation of a Mobile Sauna concession at Derrynane Blue Flag Beach, Caherdaniel, County Kerry | Kingdom Sauna Ltd. | 1 | Open Procedure | €105k |
| 25 March 2025 | Request for Tenders for the provision of Hydrometric Technician Services | Ward Personnel Limited | 2 | Open Procedure | €250k |
| 20 March 2025 | Provision of Bicycle Hire in the Phoenix Park, Dublin 8 | Oyam | 1 | Open Procedure | €1.1M |
| 12 March 2025 | Hydrotreated Vegetable Oil (HVO) | Tria Energy Limited | 3 | Open Procedure | €1.4M |
| 11 March 2025 | Mini Competition for Site Engineer Services based at the Mungret Depot, Mungret, Limerick | Ward Personnel Limited | - | Direct Invite – Mini-Competition | - |
| 10 March 2025 | Supply and delivery of Ready Mix Concrete to the Athlone Flood Alleviation Scheme, Flood Cells 1 -8, 2025. | John Spollen(Glasson) Ltd. | 3 | Open Procedure | €110k |
| 17 February 2025 | Demolition of residential units 1 and 2 at Trinity House Oberstown Children's Detention Campus, Lusk Co. Dublin. | MCB Civils Limited | 11 | Open Procedure | - |
| 14 February 2025 | Tender for Provision of Event Related Technical Supervisory Services | Desmond Rogers | 2 | Open Procedure | €1.0M |
| 6 February 2025 | Assigned Certifier Services - New Build Storage Facility, Naas Garda Station | TOBIN Consulting Engineers | 4 | Restricted Procedure | - |
| 24 January 2025 | 6 Harcourt Street, Dublin 2 - Civil and Strutural Engineering Consultancy Services | Downes Associates Limited | 5 | Open Procedure | - |
| 24 January 2025 | Request for Tenders for the Operation of a Sea Sports Concession at Derrynane National Historic Park, Caherdaniel, Co Kerry | Derrynane Sea Sports | 1 | Open Procedure | €160k |
| 23 January 2025 | Tender For Provision of Event Related Electrical Services | J. Vaughan Electrical Contractors Ltd. | 2 | Open Procedure | €3.0M |
| 17 January 2025 | Tender for Provision of Design, Supply, Installation and Removal of Exhibition Display Systems, Bespoke Signage, Staging, Backdrops, and Mesh Banner Cladding Services. | Display Contracts International Limited | 4 | Open Procedure | €6.0M |
| 16 January 2025 | Archaeological Monitoring Service - National Archives, Bride St, Dublin 8 | Irish Archaeological Consultancy Ltd | - | Simplified | - |
| 10 January 2025 | Provision of Temporary Site Services for Stage Hire, Temporary Access, Crowd Control Systems and Bespoke Scaffold Structures. | ACTAVO | 3 | Open Procedure | €4.0M |
| 9 January 2025 | Tender for Provision of Temporary Event Accommodation Structures | ACTAVO | 3 | Open Procedure | €6.0M |
| 23 December 2024 | EU Presidency Project C and SPSDPAssigned Certifier Tender | PUNCH Consulting Engineers | 2 | Open Procedure | €13.0M |
| 23 December 2024 | Safety Consultancy Services | JMG Solutions Ltd | 6 | Open Procedure | €200k |
| 23 December 2024 | The Specialist Conservation and Repair of Historic Fibrous Plaster Ceiling in Georges Hall at Dublin Castle. | HIRST CONSERVATION LTD | 1 | Competitive Procedure With Negotiation | €450k |
| 17 December 2024 | Provision of Café Services at Ionad an Bhlascaoid/ The Blasket Centre, Dún Chaoin, Co Kerry, V92 TH73 | Greyslane bistro ltd | 1 | Open Procedure | €300k |
| 12 December 2024 | Multi-Party Framework Agreement for 15 Permits to land Passengers at Sceilg Mhichíl, Co. Kerry for the Office of Public Works (OPW) | James Duff | 22 | Open Procedure | €8.4M |
| 6 December 2024 | Glebe House and Gallery, Co. Donegal - Remedial Works. | Terence Ponsonby Limited | 1 | Open Procedure | - |
| 25 November 2024 | National Centre for Research and Reconciliation - Ground Investigation Works | Causeway Geotech Ltd | 1 | Open Procedure | - |
| 22 November 2024 | Request for Tender for the provision of Ballymackeogh Scheme Embankment and Channel Survey | Murphy Geospatial Ltd (A Woolpert Company) | 1 | Open Procedure | €130k |
| 21 November 2024 | Electric 4-WD Utility Terrain Vehicle | Storm-tec | 2 | Open Procedure | €350k |
| 19 November 2024 | Request for Tenders to establish Multi Supplier Framework Agreements for the provision of Environmental Consultancy Services for Arterial Drainage Schemes Maintenance Activities in Four Lots | AtkinsRéalis | 7 | Open Procedure | €3.4M |
| 19 November 2024 | Request for Tenders to establish Multi Supplier Framework Agreements for the provision of Environmental Consultancy Services for Arterial Drainage Schemes Maintenance Activities in Four Lots | undisclosed | - | Open Procedure | €3.4M |
| 18 November 2024 | Request for Tender for the supply of Mobile Pump (Diesel Powered) in 2 Lots | Gorman-Rupp Europe B.V. | 4 | Open Procedure | €130k |
| 15 November 2024 | Dry Rot Treatment and Refurbishment works at Borris Garda Station | Cahill Crafts Ltd. | 5 | Restricted Procedure | - |
| 12 November 2024 | Establishment of a Multi-Party Framework Agreement for Small Building Works in 8 (Eight) Regional Lots. | Alan Hart Construction Services ltd | 166 | Open Procedure | €1.0bn |
| 5 November 2024 | River Deel (Crossmolina) Flood Relief Scheme Archaeological Services Contract Stages (i - iv) | Rubicon Archaeology Ltd | 2 | Open Procedure | €219k |
| 4 November 2024 | Provision of Tea Room/Café Services at Portumna Castle and Gardens, Portumna, Co Galway, H53YK27 | Catoca Fine Food and Giftware | 1 | Open Procedure | - |
| 1 November 2024 | Provision of Aerial Photography and LiDAR Survey Spring 2025 | APEM Limited | 3 | Open Procedure | €53k |
| 17 October 2024 | The provision of Environmental Consultancy Services for the Crossmolina Flood Relief Scheme | pollution and construction solutions limited T/A The Japanese Knotweed Company | 2 | Open Procedure | €266k |
| 2 October 2024 | French Church Waterford Access Scaffold | Suirside Construction LTD | 3 | Open Procedure | - |
| 2 October 2024 | Scheme Climate Change Adaptation Plans - Package A | WSP UK Ltd | 6 | Open Procedure | €502k |
| 1 October 2024 | Request for Tenders for the Provision of ICT Support Services | Nostra Systems Ltd | 1 | Open Procedure | €5.0M |
| 23 September 2024 | Construction of a new Primary School - Scoil Naisiunta Cnoc an Éin, Knockanean, Ennis, Co. Clare | Vision Contracting Limited | 16 | Restricted Procedure | - |
| 16 September 2024 | Island bridge Commemorative Bridge- Reserved Specialist | Cimolai Ireland LTD | 4 | Restricted Procedure | - |
| 13 September 2024 | Provision of Tea Rooms Services at Farmleigh House and Estate, Phoenix Park, Dublin | Kennedy's Food Store Limited | 8 | Open Procedure | €4.0M |
| 11 September 2024 | Supply of Audio Visual Equipment at Dublin Castle Conference Centre and Print Works, Dublin Castle, Dame Street, Dublin 2 | Quest Systems | 4 | Open Procedure | €100k |
| 3 September 2024 | Carlingford and Greenore Flood Relief Scheme Wave and Water Level Update | Tetra Tech Consulting Ltd | 1 | Open Procedure | €50k |
| 22 August 2024 | 111KW (150 H.P.) 4 WD Tractor with Loader | J H Fitzpatrick Ltd | 2 | Open Procedure | €110k |
| 21 August 2024 | The Provision of Predictive Coastal Erosion Hazard Mapping – Pilot Study | Jacobs Engineering Ireland Ltd | 5 | Open Procedure | €150k |
| 13 August 2024 | Plant Machinery in Three (3) Lots | Elite Woodworking Machinery | 2 | Open Procedure | €190k |
| 13 August 2024 | Kilcormac Garda Station - Universal Access Works | NHCCONSTRUCTION | 6 | Open Procedure | €200k |
| 12 August 2024 | 4 Tonne Electric Forklift | Jungheinrich Lift Trucks Ltd | 1 | Open Procedure | €150k |
| 12 August 2024 | 78kW 4-WD Backhoe Loader | ECI JCB | 1 | Open Procedure | €110k |
| 8 August 2024 | Tender for Provision of Event Management Services | arcana productions ltd | 7 | Open Procedure | €3.0M |
| 31 July 2024 | BUILDING OCCUPANCY AND ACCOMMODATION SURVEYS FOR STATE OFFICES IN THE DUBLIN AREA | Hollis Global Ltd | 9 | Open Procedure | €300k |
| 31 July 2024 | Vertical Axial Flow Pump Repair | Avonmore Electrical | 2 | Open Procedure | €50k |
| 30 July 2024 | A dedicated ferry service at scheduled times for OPW staff on Garinish Island/Inacullin between the Island and The Pier, Gengarriff, Co Cork | Brendan O Sullivan | 1 | Open Procedure | €130k |
| 19 July 2024 | Timber in Construction - Public Procurement and Demonstration Projects | Waugh Thistleton Architects | 2 | Open Procedure | - |
| 16 July 2024 | Provision of QS Services for Energy Retrofit Works at Áras an tSáile Government Offices, Renmore, Galway and Department of Social Protection, Pensions Service Office, Sligo | Cogent Associates | 4 | Open Procedure | - |
| 16 July 2024 | Event management and production services for “Christmas at the Castle” Dublin Castle | Raw Marketing and Events Ltd. | 3 | Open Procedure | €350k |
| 15 July 2024 | 18 Tonne 4 x 2 Rigid Tipper Truck | Setanta Vehicle Importers Ltd | 3 | Open Procedure | €700k |
| 12 July 2024 | Islandbridge Commemorative Bridge- Main Contractor | John Sisk and Son (Holdings) Ltd | 4 | Restricted Procedure | - |
| 11 July 2024 | The provision of Consultancy Services for preparation of Preliminary Business Case and Final Business Case for 4 x major OPW office accommodation projects | Forvis Mazars | - | Direct Invite – Mini-Competition | - |
| 1 July 2024 | 16-18 Tonne Reduced Radius Hydraulic Wheeled Excavator (up to 2 units) | McHale Plant Sales | 6 | Open Procedure | €520k |
| 18 June 2024 | Call for Tenders for the supply of Pump Station Control Panel Upgrades | Campion Pumps | 3 | Open Procedure | €110k |
| 17 June 2024 | Rated Capacity Indicator to Single Boom Hydraulic Excavator (up to 70 units) | WH Scott and Son Engineers | 2 | Open Procedure | €525k |
| 11 June 2024 | 4 Wheel Drive Articulated Telescopic Loader | Philip P McCormack (Plant) Ltd | 2 | Open Procedure | €80k |
| 5 June 2024 | A high throughput imaging platform for herbarium specimens | Bioshare Digitization | 2 | Open Procedure | €250k |
| 30 May 2024 | Supply and Delivery of 27.5KW (37 H.P.) 4WD Out Front Rotary Mower with 60” Mulching Deck | FJS Plant Repairs Ltd | 2 | Open Procedure | €300k |
| 29 May 2024 | The provision of Security Awareness Software Services and Support | ThinkCyber Security Ltd | 3 | Open Procedure | €70k |
| 23 May 2024 | Web and Mobile Application Development Expertise to Extend the Functionality of an Integrated Workplace Management System (Tririga) | TRIWORX SOFTARE SERVICES LTD | 5 | Open Procedure | €780k |
| 15 May 2024 | Office fit-out, 6 Pembroke Row | Flynn Management and Contractors | - | Direct Invite – Mini-Competition | - |
| 15 May 2024 | Replacement of Glazed Facades to Three Stair Cores at Department of Housing, Carricklawn, Wexford | Bennett Tarmacadam Ltd. | 1 | Open Procedure | €279k |
| 15 May 2024 | Ennis Courthouse Windows Conservation Works Project | Custy Construction LImited | 7 | Restricted Procedure | €1.1M |
| 13 May 2024 | Tender for Provision of Audio-Visual Services to include Audio-Visual Technicians and Equipment Hire | Clardex Systems Ltd. t/a Mongey Communications | 4 | Open Procedure | €10.0M |
| 13 May 2024 | Hydraulic Excavators in 2 Lots | FJS Plant Repairs Ltd | 5 | Open Procedure | €250k |
| 3 May 2024 | Painting conservation services for the collection for National Historic Properties Royal Hospital Kilmainham | Decowell Restoration Ltd | 1 | Open Procedure | €90k |
| 3 May 2024 | Request for Tenders dated 3/5/2024 for the provision of Palo Alto Licensing, Services and Support | Viatel Cyber Limited | 2 | Open Procedure | €750k |
| 2 May 2024 | Tractors for Arterial Drainage Maintenance and Construction in 2 Lots | J H Fitzpatrick Ltd | 1 | Open Procedure | €540k |
| 2 May 2024 | Supply and Delivery of Conservation Steam Cleaning units | Avitohol Business Group Ireland | 4 | Open Procedure | €70k |
| 16 April 2024 | Ellen's Rock Slipway and Steps 2024, Garinish Island, Glengarriff, Co Cork | Mac Plant and Civils Ltd | 3 | Open Procedure | €125k |
| 16 April 2024 | Provision of Tearoom Services at National Botanic Gardens, Kilmacurragh, Co Wicklow | Brambles | 1 | Open Procedure | €1.2M |
| 16 April 2024 | Provision of Tearoom Services at John F. Kennedy Arboretum, New Ross, Co Wexford | JTW Engineering Ltd | 1 | Open Procedure | €400k |
| 16 April 2024 | River Poddle Flood Alleviation Scheme Integrated Constructed Wetland, Tymon Park, Dublin 12 | MandN Civil Engineering | 3 | Open Procedure | €200k |
| 11 April 2024 | Civil and Structural Engineering Consultancy Services AND Project Supervisor Design Process (PSDP) Consultancy Services for Refurbishment of Trim Market House, Protected Structure (NIAH 14328036) a | O'Connor Sutton Cronin | 5 | Open Procedure | €114k |
| 10 April 2024 | 26-30 tonne Long-reach Long Crawler Hydraulic Excavator (up to 2 units) | FJS Plant Repairs Ltd | 4 | Open Procedure | €520k |
| 9 April 2024 | Clonmel Garda District HQ – Main Contractor | DUGGAN BROTHERS | 14 | Restricted Procedure | - |
| 8 April 2024 | Lifford Invasive Species treatment 2024 - 2026 | Lalor Weedfree Services Limited | 3 | Open Procedure | €200k |
| 27 March 2024 | National Concert Hall Complex - Main Contractor - Pathology Building - ESB Substation Energy Centre | Purcell Construction Limited | 11 | Restricted Procedure | - |
| 26 March 2024 | Graphic Design Services for the Office of Public Works (OPW) | Penhouse Design | 14 | Open Procedure | €140k |
| 22 March 2024 | National Concert Hall Complex - Access and Inclusivity Consultancy Services | undisclosed | 2 | Open Procedure | - |
| 20 March 2024 | Pilot Coastal Monitoring Survey Programme (PCMSP) Bathymetry Survey 2024 | Hydrographic Surveys Ltd. | 2 | Open Procedure | €40k |
| 13 March 2024 | Roof Refurbishment and Glazing Works at the Ballycroy National Park Visitor Centre, Ballycroy, County Mayo | Kellman Developments Ltd | 1 | Open Procedure | €395k |
| 6 March 2024 | The Murrough Coast Protection Scheme Maintenance Works | MJS Civil Engineering Ltd | 5 | Open Procedure | €750k |
| 26 February 2024 | Macroom Garda Divisional HQ, Gurteenroe, Macroom, Co. Cork - Consultant Quantity Surveying Services | Cumming Group Ireland | 5 | Open Procedure | - |
| 26 February 2024 | Formwork for Bridges | Doka Ireland Formwork Technologies Ltd. | 2 | Open Procedure | €150k |
| 23 February 2024 | Hammond Lane Family Court - Accessibility Consultant | Direct Access Consultancy | 2 | Open Procedure | - |
| 23 February 2024 | Hammond Lane Family Court - Acoustic Consultant | iAcoustics | 6 | Open Procedure | - |
| 23 February 2024 | Government Offices, Block1, Cork Rd, Waterford City SEAI Energy Upgrade | Mythen Construction Ltd | 2 | Restricted Procedure | €1.5M |
| 21 February 2024 | Site Safety Inspections and Audits | John Caulfield Safety Management Services | 11 | Open Procedure | €400k |
| 19 February 2024 | Supply and Installation of Masonry Cladding Whitechurch Stream Flood Alleviation Scheme (WSFAS) Rathfarnham, Dublin 14 | First Up Slu | 4 | Open Procedure | €200k |
| 12 February 2024 | A remotely monitored and managed security service for the River Poddle Flood Alleviation Scheme | Netwatch Ireland Ltd | 3 | Open Procedure | €130k |
| 12 February 2024 | Nenagh River Catchment Topographical Survey for the Office of Public Works | Murphy Geospatial Ltd (A Woolpert Company) | 2 | Open Procedure | €50k |
| 8 February 2024 | Support, Maintenance and Further Development of an Integrated Workplace Management System - Tririga | IBM Ireland | 5 | Open Procedure | €800k |
| 31 January 2024 | Renewal of existing 210 Mail Manager licenses with Maintenance. | Ideagen Ltd | 1 | Open Procedure | €110k |
| 25 January 2024 | Architectural Consultancy Services including Assigned Certifier (AC), Design Certifier (DC), Employers Representative (ER) and PSDP Consultancy Service - Office Fit Out in Cork City Centre | Jack Coughlan Architects | 13 | Restricted Procedure | - |
| 20 January 2024 | National Centre for Research and Remembrance - Fire Engineering Consultancy Services | BB7 Consulting Limited | 3 | Open Procedure | - |
| 17 January 2024 | B3184 - Raphoe District Veterinary Office - Alterations and Extension to District Veterinary Offices. | Joseph Mc Menamin and Son (Stranorlar) Ltd. | 5 | Open Procedure | €580k |
| 16 January 2024 | Request for Tenders for the Provision of Tearoom Services at Garinish Island, Glengarriff, County Cork | MARGARET HARRINGTON | 1 | Open Procedure | €360k |
| 9 January 2024 | RPFAS-Supply,Delivery of Ready Mixed Concrete for the River Poddle Flood Alleviation Scheme | Stephen Byrne Plant Hire and Civil Engineering Contractors | 2 | Open Procedure | €680k |
| 4 January 2024 | National Centre for Research and Remembrance - Dynamic Thermal Modelling | IN2 Design Partnership Ltd | 1 | Open Procedure | - |
| 21 December 2023 | Provision of Tearooms and Courtyard Cafe Services at National Botanic Gardens of Ireland, Glasnevin, Dublin 9 | Kennedy's Food Store Limited | 6 | Open Procedure | €2.2M |
| 21 December 2023 | Tender for Event Related Health and Safety Services | Crowd Safety Planning Solutions | 2 | Open Procedure | €3.0M |
| 16 December 2023 | Landscape Maintenance at the Battle of the Boyne Visitor Centre, Oldbridge, Co Meath | Complete Landscaping Ltd | 2 | Open Procedure | €270k |
| 14 December 2023 | Geogrid and Geotextile Materials for Constructing Access Haul Roads and Flood Defence Earthen Embankments | Irish Tar | 5 | Open Procedure | €300k |
| 12 December 2023 | The Supply of Granular Materials, Soils and Removal / Disposal of Waste arising from the River Poddle Flood Alleviation Scheme | MacHale Plant Hire Ltd | 6 | Open Procedure | €420k |
| 30 November 2023 | OPW Arterial Drainage Maintenance Environmental Services Contract 2024: Corrib and other Schemes | AVRIO Environmental Management | 2 | Open Procedure | €250k |
| 30 November 2023 | OPW Arterial Drainage Maintenance Environmental Services Contract 2024: Lower Shannon and other schemes | Ayesa (formerly ByrneLooby) | 1 | Open Procedure | €250k |
| 28 November 2023 | Castletown House, Celbridge- Tree Surgery Work | SAP Landscapes Ltd | 7 | Open Procedure | €60k |
| 20 November 2023 | Fitout and External Works at Enniscorthy Garda Station | Suirside Construction LTD | 9 | Restricted Procedure | €700k |
| 19 November 2023 | The provision of Tree Surgery Services for the River Poddle Flood Alleviation Scheme | Euroforest Ireland | 3 | Open Procedure | €200k |
| 19 November 2023 | Fleet Telematics for the Office of Public Works | TBF THOMPSON (GARVAGH) LTD t/a TBF CONSTRUCTION MACHINERY | 5 | Open Procedure | €950k |
| 10 November 2023 | On-Site Environmental Audits for The OPW Annual Arterial Drainage Maintenance Programme | TOBIN Consulting Engineers | 3 | Open Procedure | €50k |
| 10 November 2023 | Pilot Coastal Monitoring Survey Programme Aerial Photography and LiDAR Survey Spring 2024 | Bluesky International Ltd | 2 | Open Procedure | €125k |
| 6 November 2023 | Utility Terrain Vehicles-Diesel | FJS Plant Repairs Ltd | 2 | Open Procedure | €12k |
| 2 November 2023 | Electric Telescopic Handler | Philip P McCormack (Plant) Ltd | 1 | Open Procedure | €700k |
| 26 October 2023 | Drainage Pipes – 800mm – 810mm (External width) / 750mm – 755mm (internal width) | TPS (ROI) Ltd | 3 | Open Procedure | €200k |
| 22 October 2023 | National Centre of Reconciliation and Remembrance - Civil and Structural Engineering Consultancy Services and Project Supervisor Design Process (PSDP) Consultancy Services | Arup | 6 | Open Procedure | - |
| 17 October 2023 | Provision of Café Services, Brú na Bóinne Visitor Centre, Donore, Drogheda, Co Meath | undisclosed | - | Open Procedure | €501k |
| 13 October 2023 | Lubricating Oils and Diesel Exhaust Fluid in 3 Lots (various locations) | Joe Crowley Oils Ltd | 1 | Open Procedure | €300k |
| 10 October 2023 | 18.6KW (25 H.P.) Compact 4-WD Tractor with Loader | undisclosed | 4 | Open Procedure | €135k |
| 10 October 2023 | Provision of Cafe Services at The Glebe House and Gallery, Churchill Letterkenny Co. Donegal | Esther's Home Bakes | 1 | Open Procedure | €20k |
| 6 October 2023 | Construction of New Sluice House, Fisheries Field, Galway | C and N Higgins Construction ltd | 5 | Open Procedure | €900k |
| 4 October 2023 | 10 Passenger Electric Mini Bus | Harris Group | 1 | Open Procedure | €100k |
| 28 September 2023 | Clonmel District Headquarters GS - Civil and Structural Engineering Consultancy Services | DRA Consulting Engineers | 15 | Open Procedure | - |
| 22 September 2023 | 55kW (75 H.P.) Remote Controlled, Track Mounted Slope Mower and Attachments | Philip P McCormack (Plant) Ltd | 2 | Open Procedure | €125k |
| 21 September 2023 | The repair of the existing seawall at Derrynane House, Caherdaniel, Co. Kerry | TRIUR Construction Limited | 3 | Open Procedure | €156k |
| 20 September 2023 | Framework for Legal Advisory Services in relation to claims and disputes arising from Capital Works Projects including conciliation, mediation, adjudication and arbitration (excluding litigation). | AandL Goodbody LLP | 6 | Open Procedure | €1.3M |
| 15 September 2023 | RFT 194859 - Service Provider - Mini Tender Competition for Energy Advisory Services - Batch 1, Bundle1A +1B | Aramark | - | Direct Invite – Mini-Competition | - |
| 15 September 2023 | RFT 194859 - Service Provider - Mini Tender Competition for Energy Advisory Services - Batch 1, Bundle 3A + 3B | Aramark | - | Direct Invite – Mini-Competition | - |
| 15 September 2023 | RFT194859 Mini- Tender Competition No.1, Batch 2, Bundle 4 | Aramark | - | Direct Invite – Mini-Competition | - |
| 15 September 2023 | RFT194859 Mini- Tender Competition No.1, Batch 2, Bundle 5B | Aramark | - | Direct Invite – Mini-Competition | - |
| 15 September 2023 | RFT194859 Mini- Tender Competition No.1, Batch 3, Bundle 8 | Aramark | - | Direct Invite – Mini-Competition | - |
| 12 September 2023 | RFT 194859 - Service Provider - Mini Tender Competition for Energy Advisory Services - Batch 1, Bundle 2A + 2B | Neylons Facility Management Ltd | - | Direct Invite – Mini-Competition | - |
| 12 September 2023 | RFT194859 Mini- Tender Competition No.1, Batch 2, Bundle 5A | Neylons Facility Management Ltd | - | Direct Invite – Mini-Competition | - |
| 12 September 2023 | RFT194859 Mini- Tender Competition No.1, Batch 2, Bundle 6A+6B | Neylons Facility Management Ltd | - | Direct Invite – Mini-Competition | - |
| 12 September 2023 | RFT194859 Mini- Tender Competition No.1, Batch 3, Bundle 7 | PowerTherm Solutions Ltd | - | Direct Invite – Mini-Competition | - |
| 11 September 2023 | ACOUSTIC DOPPLER VELOCIMETER FLOW MEASUREMENT EQUIPMENT DEPLOYED ON RODS | undisclosed | - | Restricted Procedure | €49k |
| 11 September 2023 | Department Social Protection, Sligo, First Floor Fit Out | McKelvey Construction Ltd. | 10 | Open Procedure | €1.5M |
| 9 September 2023 | Excavator mounted vibratory piling hammer (up to 2 units) | Watson and Hillhouse Ltd | 2 | Open Procedure | €360k |
| 4 September 2023 | Coastal Processes and Management Training Course | Jacobs Engineering Ireland Ltd | 2 | Open Procedure | €75k |
| 1 September 2023 | Building Occupancy and Accommodation Surveys for State owned offices outside Dublin | ORS | 5 | Open Procedure | €120k |
| 21 August 2023 | Conservation and refurbishment works at Hibernian Cottage, Acres Road, Chapelizod, Phoenix Park, Dublin 8 | Duke Construction | 6 | Open Procedure | €463k |
| 18 August 2023 | Construction Programme Analyst | Carron + Walsh Construction Consultants Ltd | 1 | Open Procedure | - |
| 16 August 2023 | Conservation and Refurbishment Works at Castleknock Gate Lodge, Phoenix Park, Dublin 15 | Duke Construction | 8 | Open Procedure | €338k |
| 8 August 2023 | Roller Blinds to Government Buildings, Oliver Plunkett Road, Letterkenny, Co. Donegal | CASSIDY BLINDS LTD | 3 | Open Procedure | €35k |
| 3 August 2023 | A remotely monitored and managed security service for the Morell River Flood Management Scheme | undisclosed | - | Open Procedure | €100k |
| 30 July 2023 | Proposed carpark, demolitions and building work, civil structural and ancillary site works at Gallaghers House, Newmills Corn and Flax Mill, Milltown, Letterkenny, Co. Donegal. | undisclosed | - | Open Procedure | - |
| 29 July 2023 | Tender for Civil and Structural Engineering Services for National Library of Ireland West Wing Refurbishment | CORA Consulting Engineers | 2 | Open Procedure | - |
| 26 July 2023 | Woodworking Machinery in three (3) Lots | Elite Woodworking Machinery | 1 | Open Procedure | €100k |
| 25 July 2023 | Event management and production services for ‘Christmas at the Castle’ Dublin Castle | undisclosed | 1 | Open Procedure | €100k |
| 20 July 2023 | Frames conservation services for the collection for National Historic Properties Royal Hospital Kilmainham | undisclosed | 1 | Open Procedure | €95k |
| 19 July 2023 | The Development of the Crawford Art Gallery, Emmett Place, Cork | PJ Hegarty and Sons Building Contractor (Cork) | 9 | Open Procedure | €20.0M |
| 13 July 2023 | Raphoe Flood Relief Scheme - G.I for Site Surveys and Topographical surveys | Northwest Geotech | 3 | Open Procedure | - |
| 9 July 2023 | Kells Round Tower – Access Scaffold - Cannon Street, Kells, Co Meath | undisclosed | - | Open Procedure | - |
| 5 July 2023 | National Centre of Reconciliation and Remembrance - Geomatic Survey Services | Murphy Geospatial Ltd (A Woolpert Company) | 3 | Open Procedure | - |
| 5 July 2023 | Clonmel Model School, Co. Tipperary, Roof Works and External Windows Work | Frank C Murray and Sons Construction Ltd | 2 | Open Procedure | €315k |
| 1 July 2023 | Mobile Welfare Unit (2 Person) with Canteen, and Store Room (Approx. 10 units) | Lynton Trailers (UK) Ltd | 3 | Open Procedure | €200k |
| 30 June 2023 | Reconstruction works at Land Agent’s Cottage, Scattery Island, Co. Clare | Custy Construction LImited | 4 | Open Procedure | €390k |
| 29 June 2023 | 134kW (180 HP) 4 WD Tractor | J H Fitzpatrick Ltd | 1 | Open Procedure | €140k |
| 26 June 2023 | Window Replacement at OPW Warehouse, Mountshannon Road, Dublin 8 | Duke Construction | 4 | Open Procedure | €280k |
| 20 June 2023 | Eir Site Reinstatement Works for the Ashbourne Flood Alleviation Scheme (Ash FAS) | Formac Construction Limited | 2 | Open Procedure | €65k |
| 17 June 2023 | Water Level Sensors, Water Level/Rainfall Logging and Telemetry Data Transfer Equipment | Water Control Instrumentation Ltd. | 3 | Open Procedure | €1.0M |
| 16 June 2023 | Supply and Delivery of Steel Sheet Piles to the Morell River Flood Alleviation Scheme | Lanley Construction Ltd | 2 | Open Procedure | €750k |
| 8 June 2023 | Granular Materials, Soils, Removal and Disposal of Waste Arising from the Ashbourne FRS | MacHale Plant Hire Ltd | 2 | Open Procedure | €130k |
| 6 June 2023 | Athlone Flood Alleviation Scheme - Reinforcement Steel Tying (Labour) | Cunningham Civil and Marine Ltd | 1 | Open Procedure | €140k |
| 31 May 2023 | Single-Party Framework Agreement for Architect Led Integrated Design Team Services for the Redevelopment of the Natural History Museum | Fitzgerald Kavanagh + Partners | 10 | Restricted Procedure | €10.0M |
| 12 May 2023 | Whitechurch Stream Flood Alleviation Scheme - Reinforcement Steel Tying (Labour) | Cunningham Civil and Marine Ltd | 1 | Open Procedure | - |
| 10 May 2023 | Tender for Fire Safety Engineering Services for Kilkenny Castle | undisclosed | 4 | Open Procedure | - |
| 9 May 2023 | Replacement of existing roof, incorporating installation of PV Solar Panels. | Richard McEvoy Contracting Ltd | 2 | Open Procedure | - |
| 7 May 2023 | Pilot Coastal Monitoring Survey Programme LiDAR Survey Autumn 2023 | BSF Swissphoto GmbH | 4 | Open Procedure | €120k |
| 28 April 2023 | Provision of Civil and Structural Consultancy Services for Halla Mór at Desmond Hall & Great Hall, Newcastle West, Co Limerick | Will Rudd Davidson (Ireland) | 1 | Open Procedure | - |
| 27 April 2023 | 8.5 – 9.5 Tonne Operating Weight Reduced Radius/Compact Hydraulic Excavator (up to 4 units) | TBF THOMPSON (GARVAGH) LTD t/a TBF CONSTRUCTION MACHINERY | 4 | Open Procedure | €320k |
| 19 April 2023 | Contract Administrator for an OPW Multiparty Framework Agreement | Carron + Walsh Construction Consultants Ltd | 1 | Open Procedure | €10.0M |
| 16 April 2023 | The supply and delivery of granular materials and the removal of waste from the Athlone Flood Alleviation Scheme. | Mannion Quarries | 2 | Open Procedure | €248k |
| 15 April 2023 | Rosslare Europort Terminal 7 & Enabling Works - Provision of Civil and Structural Resident Engineering Services | O'Connor Sutton Cronin | 2 | Open Procedure | €300k |
| 31 March 2023 | Lower Lee Flood Relief Scheme - Hydrographic and Topographic Survey | undisclosed | 1 | Open Procedure | €150k |
| 30 March 2023 | 4 Axle Step Frame Trailer | Ashbourne Truck Centre | 1 | Open Procedure | €110k |
| 29 March 2023 | Provision, Delivery, and Installation of An Industrial Conveyer Type Dishwasher and Ancillary Items for Leinster House (Including Training and Support). | Martin Food Equipment | 6 | Open Procedure | - |
| 24 March 2023 | Civil and Structural Engineering Consultancy AND Project Supervisor Design Process (PSDP) Consultancy Services for Galway Sluice Barrage (Salmon Weir) Structural Assessment | Gavin and Doherty Geosolutions | 3 | Open Procedure | €65k |
| 22 March 2023 | Conservation and Repair of the former Carpentry Block, St. Conleths, Daingean, Co. Offaly | Noel Cunningham Construction Ltd | 4 | Open Procedure | - |
| 8 March 2023 | Provision of Cleaning Services at Tintern Abbey, Co. Wexford | Glantoiri Teoranta | - | Direct Invite – Quick Quote | - |
| 12 February 2023 | Engineering Consultancy Services - East Region Embankments - Survey and Data Processing | Murphy Geospatial Ltd (A Woolpert Company) | 4 | Open Procedure | €100k |
| 9 February 2023 | OPW Arterial Drainage Maintenance, Environmental Services Contract 2023-2025 | undisclosed | 1 | Open Procedure | €700k |
| 5 February 2023 | Tender for provision of Civil and Structural Engineering Consultancy Services for Projects A and B at Kilkenny Castle | undisclosed | 6 | Open Procedure | - |
| 2 February 2023 | Repair and conservation of roofs, including replacement of roof coverings, to the north and south gate lodges at the National Botanic Gardens, Glasnevin, Dublin 9 | Skyline Supplies Limited | 7 | Open Procedure | - |
| 22 January 2023 | Athlone Flood Alleviation Scheme - Sheet Piles at Flood Cell 8 - Golden Island | undisclosed | 6 | Open Procedure | €2.3M |
| 15 January 2023 | Resident Site Architects | kppm | 2 | Open Procedure | €1.5M |
| 13 January 2023 | Provision of Cleaning, Security, Pest Control and Hygiene Services at the OPW Building, Claremorris, Co. Mayo | Grosvenor Services | 2 | Open Procedure | - |
| 12 January 2023 | The Supply & Delivery of Ready Mixed Concrete to the Athlone Flood Alleviation Scheme | John Spollen(Glasson) Ltd. | 3 | Open Procedure | €186k |
| 8 January 2023 | River Weed Cutting Boat with ‘T’ type cutting head | undisclosed | 2 | Open Procedure | €240k |
| 7 January 2023 | The Supply & Delivery of Ready Mixed Concrete | Keegan Quarries Ltd | 3 | Open Procedure | - |
| 6 January 2023 | Supply of Granular Materials, Soils and Removal/Disposal of Waste- Whitechurch Flood Alleviation Scheme | MacHale Plant Hire Ltd | 5 | Open Procedure | - |
| 6 January 2023 | Supply and Delivery of Reinforcing Steel - Whitechurch Flood Alleviation Scheme | Stephen Byrne Plant Hire and Civil Engineering Contractors | 1 | Open Procedure | - |
| 21 December 2022 | Coastal Aerial LiDAR & Imagery Survey 2023 – East to South Coast of Ireland | BSF Swissphoto GmbH | 5 | Open Procedure | €450k |
| 8 December 2022 | Bandon Flood Relief Scheme Environmental Monitoring (Macroinvertebrates & Flora). | Rivus | - | Direct Invite – Quick Quote | - |
| 8 December 2022 | Bandon Flood Relief Scheme – Post Works Environmental Monitoring of Fish | Rivus | - | Direct Invite – Quick Quote | - |
| 18 November 2022 | Pilot Coastal Monitoring Survey Programme— Aerial Photography Spring 2023 | Bluesky International Ltd | 2 | Open Procedure | €130k |
| 28 October 2022 | Lower Shannon Sediment Survey | Murphy Geospatial Ltd (A Woolpert Company) | 2 | Open Procedure | €90k |
| 13 October 2022 | Design, Fabricate and Supply Concrete Box Culverts | Drumderry Aggregate Ltd | 3 | Open Procedure | - |
| 3 October 2022 | ITT for the Provision of Resurfacing and Ancillary Works, Visitor Car Park, Newmills, Co. Donegal | MILLIGAN BROS. LTD | 1 | Open Procedure | - |
| 25 September 2022 | Rosslare Europort Terminal 7 and Enabling Works | undisclosed | 1 | Open Procedure | €200.0M |
| 22 September 2022 | Towable ADR Fuel Bowser (2 to 4 units) | Cashels Engineering Ltd. | 2 | Open Procedure | - |
| 9 September 2022 | Sligo Courthouse Measured Building Survey | Paul Corrigan and Assoc. Ltd. | 6 | Open Procedure | - |
| 7 August 2022 | Stop Log Structure for OPW Galway Sluice Barrage | KWT | 2 | Open Procedure | €300k |
| 5 August 2022 | Tractor Drawn Hook-loader Trailer with body | J H Fitzpatrick Ltd | 3 | Open Procedure | €100k |
| 26 July 2022 | The supply and delivery of ready mixed concrete to the Morell River Flood Alleviation Scheme, 2022. | undisclosed | 3 | Open Procedure | - |
| 22 July 2022 | Survey Services for OPW Embankment Infrastructure (West Region) and Comparison to Scheme Drawings | Murphy Geospatial Ltd (A Woolpert Company) | 1 | Open Procedure | €136k |
| 30 June 2022 | 120kW (160 HP) 4 WD Tractor | J H Fitzpatrick Ltd | 1 | Open Procedure | €120k |
| 23 June 2022 | The supply and delivery of reinforcing steel to the Athlone Flood Alleviation Scheme 2022 | undisclosed | 2 | Open Procedure | €150k |
| 28 May 2022 | The provision of Architectural Services in the Heritage Services area of the Office of Public | undisclosed | 1 | Open Procedure | €4.0M |
| 27 May 2022 | Coastal Monitoring Survey Programme LiDAR Survey Autumn 2022 | Bluesky International Ltd | 5 | Open Procedure | €175k |
| 25 May 2022 | Shannon Airport Weather Station Upgrade Works | M Fitzgibbon Contractors Ltd | 5 | Open Procedure | - |
| 20 May 2022 | Provision of Energy Metering Systems | HandF Electrical Contractors Ltd. | 4 | Open Procedure | €2.0M |
| 18 May 2022 | Provision of a Retail Gift Stop at Bru Na Boinne Visitor Centre | undisclosed | 1 | Open Procedure | - |
| 6 May 2022 | Office Fit Out for the Department of Social Protection at Fairgreen, Mallow, Co Cork | undisclosed | 7 | Open Procedure | - |
| 28 April 2022 | Provision of Concessionary Café Services located at Kilmainham Gaol Museum and Courthouse | Brambles | 2 | Open Procedure | - |
| 13 April 2022 | Supply of Concrete to facilitate for works | undisclosed | 1 | Open Procedure | - |
| 10 April 2022 | Hydraulic Excavators in 5 Lots | McSharry TRACK Ltd. | 5 | Open Procedure | €4.5M |
| 10 April 2022 | Coastal Monitoring Survey Programme Bathymetry Survey 2022 | Hydrographic Surveys Ltd. | 3 | Open Procedure | €100k |
| 10 April 2022 | Environmental Clerk of Works Service | EcoQuest Environmental | 4 | Open Procedure | €215k |
| 8 April 2022 | Provision of Media Monitoring Service | undisclosed | 3 | Open Procedure | - |
| 8 April 2022 | Danganbeg Bridge Replacement | TRIUR Construction Limited | 5 | Open Procedure | - |
| 7 April 2022 | Multi-Supplier Framework Agreement for Conservation Works Projects in the Leinster Region for the Commissioners of Public Works | undisclosed | - | Open Procedure | €34.0M |
| 26 March 2022 | SD/02/22 - The Supply of Office Pedestal Seating | undisclosed | 6 | Open Procedure | €3.0M |
| 25 February 2022 | Clean Blasted 1-7 Tonne Angular Rock Armour Boulders for the Construction and Maintenance of River Bank Erosion Control Measures in the River Feale Catchment Drainage Scheme in Co. Kerry | Ardfert Quarry Products | 3 | Open Procedure | - |
| 25 February 2022 | Clean Blasted 1-7 Tonne Angular Rock Armour Boulders for the Construction and Maintenance of River Bank Erosion Control Measures in the River Maine Catchment Drainage Scheme in Co. Kerry | Michael F. Quirke and Sons | 3 | Open Procedure | - |
| 16 February 2022 | Hydrometric Processing Section Engineering Support | JBA Consulting Engineers and Scientists | 1 | Open Procedure | €130k |
| 25 December 2021 | Drone Survey & Visual Asset Inspections - Shannon Estuary North Embankments | RAB Consultants Ltd | 3 | Open Procedure | €110k |
| 17 December 2021 | Lower Shannon Option - Preliminary Design | undisclosed | 1 | Open Procedure | €50k |
| 15 December 2021 | Supply of Mobile Diesel Powered Pumps for the Springfield Flood Relief Scheme | undisclosed | 4 | Open Procedure | €275k |
| 13 December 2021 | Design, Supply and Installation of Penstocks for Springfield Flood Relief Scheme | undisclosed | 4 | Open Procedure | - |
| 10 December 2021 | Main Contractor for Office Fit Out for the Department of Social Protection (DSP) at Blackwater Centre, Fermoy, Co. Cork | undisclosed | 10 | Open Procedure | - |
| 8 December 2021 | Environmental Consultancy Services for the Office of Public Works Arterial Drainage Maintenance Activities | undisclosed | 2 | Open Procedure | €100k |
| 5 December 2021 | Global Positioning System (GPS) Equipment | Carlson EMEA BV | 2 | Open Procedure | €120k |
| 2 December 2021 | Coastal Aerial LiDAR Survey 2022 - West to North Coast of Ireland | Fugro NL Land | 5 | Open Procedure | €450k |
| 27 November 2021 | SD-05-21 - Request for Tenders for The Supply & Installation of Desking, Pedestals & Storage Units. | undisclosed | 1 | Open Procedure | €8.0M |
| 21 November 2021 | Safety Consultancy Services | JMG Solutions Ltd | 4 | Open Procedure | €130k |
| 19 November 2021 | The works under this contract will be mainly intrusive investigation works for geotechnical purposes to aid the design of a Flood Relief Scheme by the Engineering Consultants, RPS. | Causeway Geotech Ltd | 2 | Open Procedure | - |
| 12 November 2021 | Civil and Environmental Engineering and Project Supervisor Design Process (PSDP) Consultancy Services for the repair of the existing seawall at Derrynane House, Caherdaniel, County Kerry | Ayesa (formerly ByrneLooby) | 2 | Open Procedure | - |
| 6 November 2021 | Coastal Monitoring Survey Programme Aerial Photography Spring 2022 | undisclosed | 4 | Open Procedure | €190k |
| 5 November 2021 | Formwork for Bridges | Doka Ireland Formwork Technologies Ltd. | 1 | Open Procedure | - |
| 1 November 2021 | The supply of Theatre Lights, Printworks , Dublin Castle | A C Entertainment Technologies Ireland Ltd | 3 | Open Procedure | - |
| 29 October 2021 | Supply of Ruggedised Notebook Computers | Renovotec Ltd | 1 | Open Procedure | - |
| 29 October 2021 | Supply and delivery of reinforcing steel for the Morell River Flood Management Scheme | undisclosed | 1 | Open Procedure | - |
| 17 October 2021 | SPECIALIST SERVICES FOR STATEWIDE ENERGY CONSERVATION INITIATIVE IN CENTRAL GOVERNMENT & PUBLIC SECTOR BUILDINGS | Aramark | 1 | Open Procedure | €4.0M |
| 1 October 2021 | Services to Review the Methodologies Available for Coastal Erosion Hazard Mapping | Jacobs Engineering Ireland Ltd | 3 | Open Procedure | €85k |
| 28 September 2021 | Renewal of Appcheck-NG license subscription | Baker Security and Networks | 2 | Open Procedure | - |
| 23 September 2021 | Data Security and Ransomware protection solution for SAN Environment | Logicalis Technology Ltd | 1 | Open Procedure | - |
| 18 September 2021 | SD-02-21 - The Supply of Mattresses, Duvets & Pillows to Various Places of Detention | undisclosed | 1 | Open Procedure | €500k |
| 4 September 2021 | Structural Engineering Consultancy Services and PSDP | McFarland Consulting Ltd | 2 | Open Procedure | €100k |
| 3 September 2021 | Global Positioning System (GPS) Equipment | undisclosed | 2 | Open Procedure | €120k |
| 3 September 2021 | Supply and delivery of reinforcing steel to the Athlone Flood Alleviation Scheme, Flood Cells 1-8: the Strand; the Quay; Brick Island; Deerpark; River Al; Golden Island; Iona Park; & Marine View | undisclosed | 1 | Open Procedure | - |
| 2 September 2021 | Rated Capacity Indicator and Height Limiters for Hydraulic Excavators in 4 Lots | WH Scott and Son Engineers | 2 | Open Procedure | €466k |
| 26 August 2021 | Provision of Communications Services | undisclosed | 5 | Open Procedure | €600k |
| 19 August 2021 | Articulated Wheeled Dumper in Two Lots | EMS | 1 | Open Procedure | €750k |
| 19 August 2021 | Deep Retrofit of 22-25 Clare Street, Dublin 2 | undisclosed | 9 | Open Procedure | - |
| 15 August 2021 | Woodchippers in 3 Lots | Glendun Plant Sales Limited | 3 | Open Procedure | €837k |
| 11 August 2021 | Newmarket-on-Fergus Flood Embankments -Geophysical Survey | Minerex Geophysics Ltd. | 5 | Open Procedure | - |
| 6 August 2021 | Acoustic Doppler Current Profilers | Xylem Analytics UK Ltd | 2 | Open Procedure | €180k |
| 3 August 2021 | Coastal Monitoring Survey Programme Supplementary LiDAR Survey Autumn 2021 | Bluesky International Ltd | 1 | Open Procedure | - |
| 31 July 2021 | Mobile Welfare Units (Two Lots) | Maloney Plant Hire Ltd | 2 | Open Procedure | €1.7M |
| 24 July 2021 | Multiparty Framework Contract for the purposes of delivering on maintenance and minor building works for the greater Dublin Region. | P.J. Hegarty and Sons (Dublin) - aka PJ Hegarty | 4 | Open Procedure | €40.0M |
| 21 July 2021 | Services to Review the Methodologies Available for Coastal Erosion Hazard Mapping | undisclosed | - | Open Procedure | €60k |
| 21 July 2021 | SERVICE PROVIDERS FOR STATEWIDE ENERGY CONSERVATION INITIATIVE | Aramark | 6 | Open Procedure | €1.0M |
| 16 July 2021 | And delivery of ready mixed concrete to the Morell River Flood Alleviation Scheme, 2021 | undisclosed | 1 | Open Procedure | - |
| 1 July 2021 | DN150 (6 inch) Mobile Pump - Diesel Powered | WAC McCandless Ltd | 5 | Open Procedure | €300k |
| 25 June 2021 | Coastal Monitoring Survey Programme LiDAR Survey Autumn 2021 | Bluesky International Ltd | 1 | Open Procedure | - |
| 17 June 2021 | Hydraulic Excavator Attachments in Seven Lots | Philip P McCormack (Plant) Ltd | 3 | Open Procedure | €827k |
| 13 June 2021 | Woodchippers in 3 Lots | undisclosed | - | Open Procedure | €837k |
| 6 June 2021 | Land Law, Conveyancing and Property Title Registration Consultancy Services | Fergus Hayden | 4 | Open Procedure | €200k |
| 27 May 2021 | The supply and delivery of ready mixed concrete to the Athlone Flood Alleviation Scheme 2021 | undisclosed | 1 | Open Procedure | €150k |
| 16 May 2021 | 15 - 17 Tonne Reduced Radius Hydraulic Excavator | TBF THOMPSON (GARVAGH) LTD t/a TBF CONSTRUCTION MACHINERY | 4 | Open Procedure | €2.3M |
| 13 May 2021 | Proposed Replastering & Gate Lodge, Doneraile Court, Doneraile, Co. Cork. | Farnes Construction Ltd | 4 | Open Procedure | - |
| 2 May 2021 | Deep Retrofit of 22-25 Clare Street, Dublin 2 | undisclosed | 7 | Open Procedure | - |
| 23 April 2021 | Morell River Flood Management Scheme - Wall Cladding Works | undisclosed | 1 | Open Procedure | - |
| 21 April 2021 | Supply of and Delivery of ready mixed concrete. | undisclosed | - | Open Procedure | €150k |
| 18 April 2021 | Rated Capacity Indicators and Height Limiters for Hydraulic Excavators | undisclosed | 3 | Open Procedure | €650k |
| 16 April 2021 | Heavy Duty Wed Cutting Boat with 'D' Type Cutting Head | Aquatic Control Engineering Ltd | 3 | Open Procedure | €150k |
| 16 April 2021 | Precast Works-McQuaid's Bridge Athlone | Brian Conneely and Company. Ltd | 1 | Open Procedure | €207k |
| 1 April 2021 | Aggregate Material and Rock Armour Required to Facilitate the Embankment Construction Programme at Springfield, Clonlara, Co. Clare | Ward and Ward Ltd | 3 | Open Procedure | - |
| 1 April 2021 | Subsoil Material for the Springfield Flood Defence Embankments at Springfield, Clonlara, Co. Clare | Rowen Haulage (Limerick) Ltd | 3 | Open Procedure | - |
| 28 March 2021 | Welfare Units in Four Lots | Ballina Engineering Works Ltd | 3 | Open Procedure | €1.6M |
| 26 March 2021 | 108kW (145 HP) 4WD Tractor with Front Loader | J H Fitzpatrick Ltd | 2 | Open Procedure | €125k |
| 21 March 2021 | Coastal Aerial LiDAR Survey 2021 – South West Coast of Ireland | Fugro NL Land | 4 | Open Procedure | €550k |
| 17 March 2021 | Aggregate material required to facilitate the Embankment refurbishment programme on the River Maine in Co. Kerry | Michael F. Quirke and Sons | 3 | Open Procedure | €160k |
| 15 March 2021 | Aggregate material required to facilitate the Embankment refurbishment programme on the River Feale in Co. Kerry | Ardfert Quarry Products | 1 | Open Procedure | - |
| 14 March 2021 | Tri-axle Tractor Drawn Low-Loader Trailer | Lynch Trailers | 1 | Open Procedure | €90k |
| 14 March 2021 | The supply and delivery of steel sheet piles to the Morell River Flood Management Scheme, Turnings Lower, North Naas, Bodenstown, Co. Kildare | undisclosed | 3 | Open Procedure | €400k |
| 13 March 2021 | Electric Buses | Harris Retail Unlimited Company | 3 | Open Procedure | €2.4M |
| 12 March 2021 | Ballinasloe Flood Relief Scheme Topographical Survey | undisclosed | 4 | Open Procedure | - |
| 11 March 2021 | Bored Piles for McQuaid's Bridge, Deerpark, Athlone - Athlone Flood Alleviation Scheme | Cunningham Civil and Marine Ltd | 2 | Open Procedure | - |
| 10 March 2021 | The supply and delivery of granular materials to, and the removal of waste from, the Athlone Flood Alleviation Scheme 2021 | undisclosed | 3 | Open Procedure | - |
| 28 February 2021 | Main Contractor - Block J Refurbishment | undisclosed | 16 | Restricted Procedure | - |
| 24 February 2021 | Tracked Dumper 2.5 - 3.0 Tonne Capacity | Philip P McCormack (Plant) Ltd | 1 | Open Procedure | €110k |
| 21 February 2021 | The supply and delivery of embankment fill material to Flood Cells 1,5 & 8 of the Athlone Flood Alleviation Scheme | undisclosed | 4 | Open Procedure | €174k |
| 19 February 2021 | SD-01-21 - Provision of a Collection/Transfer of Furniture, Environmental Disposal Service | undisclosed | 6 | Open Procedure | €300k |
| 12 February 2021 | 27.5KW (37 HP) Zero Turn Tractor Lawnmower with 60” Mulching Deck | Dublin Grass Machinery | 2 | Open Procedure | €150k |
| 3 February 2021 | The Office of Public Works (OPW) intends establishing a multiparty Framework Contract for the purposes of delivering on design and construction of fit-out and refurbishment works in buildings. | Flynn Management and Contractors | 15 | Open Procedure | €40.0M |
| 25 January 2021 | Coastal Monitoring Survey Programme Aerial Photography Spring 2021 | APEM Ltd | 3 | Open Procedure | - |
| 17 January 2021 | Project Archaeologist Services for Office of Public Works' Flood Relief Schemes and Arterial Drainage Maintenance Works | Archaeological Management Solutions | 2 | Open Procedure | €1.2M |
| 16 December 2020 | Service Provider for the Provision of Contract Professional and Technical Resources to the OPW | undisclosed | 6 | Open Procedure | €5.0M |
| 16 December 2020 | Granular Materials, Soil Removal and Disposal of Waste | MacHale Plant Hire Ltd | 5 | Open Procedure | - |
| 8 December 2020 | The Office of Public Works requires licenses for Tableau visual analytics software. | The Information Lab | 1 | Open Procedure | - |
| 6 December 2020 | Environmental Consultancy Services for Strategic Environmental Assessment and Appropriate Assessment of the National Arterial Drainage Maintenance Activities 2022-2027 | JBA Consulting Engineers and Scientists | 2 | Open Procedure | €83k |
| 29 November 2020 | Minor / Intermediate Electrical Building Services Works Framework | undisclosed | 25 | Open Procedure | - |
| 29 November 2020 | Minor / Intermediate Mechanical Building Services Works | undisclosed | 22 | Open Procedure | €8.0M |
| 5 November 2020 | Wheeled Dumpers 2.8 - 3.0 Tonne Capacity | EMS | 1 | Open Procedure | €500k |
| 25 October 2020 | Provision of a digital workplace software solution | MangoApps Inc. | 6 | Open Procedure | €180k |
| 21 October 2020 | A remotely monitored and managed security service for the Morell River Flood Management Scheme | undisclosed | 3 | Open Procedure | - |
| 18 October 2020 | Tractor Lawnmowers | Gort na Vogue Ltd. | 6 | Open Procedure | €736k |
| 11 October 2020 | 2.6 Tonne Operating Weight Reduced Radius/Compact Hydraulic Excavator | TBF THOMPSON (GARVAGH) LTD t/a TBF CONSTRUCTION MACHINERY | 4 | Open Procedure | €540k |
| 7 October 2020 | Repair /refurbishment of rear facades of 10-15 O' Connell Street, Dublin 1 | undisclosed | 9 | Open Procedure | - |
| 1 October 2020 | Welfare Cabins Provision | Lidan Designs | 2 | Open Procedure | - |
| 30 September 2020 | Blockwork boundary walls for the Ashbourne Flood Alleviation Scheme | Rocks Road Stone Co Ltd. | 2 | Open Procedure | - |
| 27 September 2020 | Athlone Flood Alleviation Scheme - Wall Cladding - Marine View & Deerpark | undisclosed | 4 | Open Procedure | €500k |
| 25 September 2020 | Supply of steel fixing services to the Athlone Flood Alleviation Scheme | undisclosed | 1 | Open Procedure | - |
| 24 September 2020 | Steel fixing services for the Morell River Flood Management Scheme, Turnings Lower, North Naas, Bodenstown, Co. Kildare | undisclosed | 2 | Open Procedure | - |
| 21 September 2020 | The supply and delivery of reinforcing steel to the Morell River Flood Management Scheme; Turnings Lower, North Naas, Bodenstown, Co. Kildare | undisclosed | 1 | Open Procedure | - |
| 5 September 2020 | Drainage Pipes in 2 Lots | undisclosed | 1 | Open Procedure | €390k |
| 4 September 2020 | Excavator Mounted Hydraulics Mulching Heads | Philip P McCormack (Plant) Ltd | 2 | Open Procedure | €80k |
| 3 September 2020 | Graphic Design Services for the Office of Public Works (OPW) | Penhouse Design | 27 | Open Procedure | - |
| 23 August 2020 | Wheeled Dumpers - 2.8-3.0 Tonne Capacity | undisclosed | - | Open Procedure | €200k |
| 9 August 2020 | Weed Cutting Boats and (Tractor Drawn) Trailers | Mastenbroek Environmental Ltd | 2 | Open Procedure | €700k |
| 6 August 2020 | Browneshill Dolmen - Site Access Upgrade | undisclosed | 5 | Open Procedure | - |
| 29 July 2020 | 50 Bluebeam Revu CAD licences with Maintenance | Real Data Systems Ltd | 2 | Open Procedure | - |
| 27 July 2020 | Ashbourne FAS- Temporary Works - Contractor as Designer | Manning Ground Engineering Contractors Ltd. | 1 | Open Procedure | - |
| 26 July 2020 | Supply of Water Level Sensors, Water Level / Rainfall Logging and Telemetry Data Transfer Equipment | NVM Limited | 10 | Open Procedure | €600k |
| 23 July 2020 | 4.4 Tonne-Metre Truck Mounted Crane | palfinger ireland limited | 1 | Open Procedure | €180k |
| 19 July 2020 | 4WD Tractors | Armstrong Machinery Ltd | 4 | Open Procedure | €500k |
| 19 July 2020 | 4WD Panel Vans | Volkswagen Group Ireland Ltd | 3 | Open Procedure | €225k |
| 12 July 2020 | OPW Framework for Grade 1 Conservation Architect Services | 7L Architects | 14 | Open Procedure | €8.0M |
| 5 July 2020 | The Supply of Canteen & Conference Chairs (SD/09/19) | undisclosed | 12 | Open Procedure | €900k |
| 22 June 2020 | Hosting and Support of MPRO5 Application Platform | undisclosed | 1 | Open Procedure | - |
| 20 June 2020 | 18 Tonne GVW Rigid Tipper Truck c/w Crane | DAF Distributors Ireland | 7 | Open Procedure | €1.4M |
| 13 June 2020 | 4WD Backhoe Loader | ECI JCB | 1 | Open Procedure | €200k |
| 12 June 2020 | The Supply and Delivery of Granular Materials, Soils and Removal & Disposal of Waste Arisings on the Morell River Flood Management Scheme, Turnings Lower, North Naas, Bodenstown, Co. Kildare | undisclosed | 4 | Open Procedure | €300k |
| 19 May 2020 | Fermoy South East & South West Drainage Schemes - Pumping Stations Operation & Maintenance (O&M) Contract | FM Environmental Ltd | 7 | Open Procedure | - |
| 6 May 2020 | Design, supply, installation, commissioning, testing and certification of sheet piles at Deerpark as part of the Athlone Flood Alleviation Scheme. | undisclosed | 3 | Open Procedure | - |
| 3 May 2020 | Options and Recommendations for the Economic Appraisal of Capital Flood Relief Schemes | Mott MacDonald Ireland | 6 | Open Procedure | - |
| 1 May 2020 | Land Law, Conveyancing and Property Title Registration Consultancy Services | undisclosed | 6 | Open Procedure | €160k |
| 19 April 2020 | High Performance Hydraulic Rock Breaker | Philip P McCormack (Plant) Ltd | 7 | Open Procedure | €100k |
| 17 April 2020 | Refurbishment of Block J, Garda HQ, Phoenix Park | undisclosed | 9 | Open Procedure | - |
| 10 April 2020 | 28-30 Tonne Reduced Radius Hydraulic Excavator | McSharry TRACK Ltd. | 4 | Open Procedure | €492k |
| 8 April 2020 | GIS Specialist | Icon Geo | 3 | Open Procedure | - |
| 5 April 2020 | Excavator Mounted Hydraulic Tree Shears | Quinlan Machinery Sales | 5 | Open Procedure | €267k |
| 26 March 2020 | Tractor Drawn Trailers | Continental Soil Technology Ltd | 4 | Open Procedure | €330k |
| 24 March 2020 | Environmental Clerk of Works | EcoQuest Environmental | 16 | Open Procedure | - |
| 20 March 2020 | Reinstatement of roads and footpaths, Ashbourne Flood Alleviation Scheme | Lakeland Civil Engineering Ltd. | 3 | Open Procedure | - |
| 18 March 2020 | Truck Mounted Crane | undisclosed | 2 | Open Procedure | €80k |
| 14 March 2020 | DN200 (8inch) Mobile Pump – Diesel Powered | Euroflo Fluid Handling Limited | 5 | Open Procedure | €480k |
| 11 March 2020 | Reinstatement of Tarmac Roads – Athlone Flood Alleviation Scheme | undisclosed | 6 | Open Procedure | - |
| 9 March 2020 | Hydrometric Technician Services | Murphy Geospatial Ltd (A Woolpert Company) | 3 | Open Procedure | - |
| 7 March 2020 | Track Dumper 4.75 - 5.5 Tonne Capacity | Philip P McCormack (Plant) Ltd | 1 | Open Procedure | €450k |
| 27 February 2020 | The supply and delivery of granular materials to, and the removal of waste from, the Athlone Flood Alleviation Scheme, Flood Cells 1-8. | undisclosed | 3 | Open Procedure | €195k |
| 24 February 2020 | provision of Tourism Consultancy Advisory and Programme/Project Co-ordination Services | the tourism company | 5 | Open Procedure | - |
| 23 February 2020 | Architect Led Integrated Design Team for Altamont House & Gardens Development Project | undisclosed | 4 | Open Procedure | €500k |
| 21 February 2020 | Equipment and service to upgrade to All Flash SAN | Logicalis Technology Ltd | 1 | Open Procedure | €500k |
| 21 February 2020 | Supply and delivery of reinforcing steel to the Athlone Flood Alleviation Scheme, Flood Cells 1-8: the Strand; the Quay; Brick Island; Deerpark; River Al; Golden Island; Iona Park; & Marine View | undisclosed | 2 | Open Procedure | - |
| 21 February 2020 | The supply and delivery of ready mixed concrete to the Athlone Flood Alleviation Scheme, Flood Cells 1-8: the Strand; the Quay; Brick Island; Deerpark; River Al; Golden Island; and Marine View | undisclosed | 2 | Open Procedure | - |
| 10 February 2020 | Electrical maintenance services for Dublin Castle | ETAV Limited | 2 | Open Procedure | €600k |
| 30 January 2020 | Aggregate Material Required To Facilitate The Embankment Refurbishment Programme On The River Feale In County Kerry | Ardfert Quarry Products | 1 | Open Procedure | - |
| 30 January 2020 | Aggregate Material Required To Facilitate The Embankment Refurbishment Programme On The River Maine In County Kerry in 2 Lots | MICHAEL CRONIN SAND and GRAVEL LTD | 2 | Open Procedure | - |
| 23 January 2020 | Maintenance Management Services | undisclosed | - | Open Procedure | €3.0M |
| 15 January 2020 | Clean Blasted 5-7 Tonne Angular Rock Armour Boulders | Ardfert Quarry Products | 4 | Open Procedure | - |
| 20 December 2019 | Cashen Estuary Drainage Project - Site Investigation | Priority Geotechnical Limited | 6 | Open Procedure | €219k |
| 29 November 2019 | Tri-Axle Truck Drawn Low-Loader Trailer | McCauleys Trailers Ltd. | 2 | Open Procedure | €50k |
| 27 October 2019 | Provision of ongoing software support services to The Commissioners of Public Works (OPW) | Eurosoftware Conversions | 1 | Open Procedure | - |
| 18 October 2019 | Engineer – Hydrometric Processing Section | undisclosed | - | Open Procedure | €128k |
| 3 October 2019 | Tractors in four Lots | Armstrong Machinery Ltd | 10 | Open Procedure | €900k |
| 1 October 2019 | Provision of Retail and Tourist Information Services at Brú na Bóinne Visitor Centre | undisclosed | 2 | Open Procedure | - |
| 27 September 2019 | Track Dumpers in Two Lots | Philip P McCormack (Plant) Ltd | 1 | Open Procedure | €435k |
| 22 September 2019 | Supply of Granular materials, soils and removal and disposal of waste arisings | MacHale Plant Hire Ltd | 1 | Open Procedure | €210k |
| 19 September 2019 | Supply and Delivery of Steel Reinforcement | Stephen Byrne Plant Hire and Civil Engineering Contractors | 1 | Open Procedure | - |
| 19 September 2019 | Site Safety Inspections and Audits | Corribview Safety Services Ltd. | 8 | Open Procedure | €375k |
| 18 September 2019 | Service Catering Concession for the Operation of the Café at Brú na Bóinne Visitor Centre | undisclosed | 3 | Open Procedure | €1.0M |
| 18 September 2019 | Supply of Ready Mixed Concrete | Keegan Quarries Ltd | 2 | Open Procedure | - |
| 15 September 2019 | 5.5-6.2 tonne Operating Weight, Reduced Radius / Compact Hydraulic Excavator | McSharry TRACK Ltd. | 10 | Open Procedure | €408k |
| 13 September 2019 | Fire Suppression System Specialist (2019) - Archival Repository Project, Bishop Street, Dublin 8 | undisclosed | 1 | Restricted Procedure | - |
| 31 August 2019 | 18 Tonne GVW Rigid Truck | DAF Distributors Ireland | 3 | Open Procedure | €110k |
| 30 August 2019 | 4WD Articulated Telescopic Loader c/w attachments | ECI JCB | 2 | Open Procedure | €75k |
| 30 August 2019 | National Concert Hall Redevelopment Programme Measured Building Survey | undisclosed | - | Open Procedure | - |
| 28 August 2019 | Mechanical Specialist (2019) - Archival Repository Project, Bishop Street, Dublin 8 | undisclosed | 2 | Restricted Procedure | - |
| 28 August 2019 | Electrical Specialist (2019) - Archival Repository Project, Bishop Street, Dublin 8 | undisclosed | 5 | Restricted Procedure | - |
| 28 August 2019 | Lift Specialist (2019) - Archival Repository Project, Bishop Street, Dublin 8 | undisclosed | - | Restricted Procedure | - |
| 22 August 2019 | Consulting Service for Mechanical and Electrical Engineering Design of Building Services | undisclosed | 1 | Open Procedure | €4.0M |
| 18 August 2019 | Framework for the provision of Technical Engineering Consultancy Services | undisclosed | 15 | Open Procedure | €3.0M |
| 3 August 2019 | Supply and delivery of embankment fill material to the Morell River Flood Management Scheme, Turnings Lower, North Naas, Bodenstown, Co. Kildare | undisclosed | 4 | Open Procedure | €335k |
| 31 July 2019 | Supply and delivery of ready mixed concrete to the Morell River Flood Management Scheme, Co. Kildare (1) | undisclosed | 2 | Open Procedure | - |
| 24 July 2019 | Design, supply, installation, testing and certification of wall cladding and paving at the Quay and the Strand as part of the Athlone Flood Alleviation Scheme | undisclosed | 3 | Open Procedure | €850k |
| 12 July 2019 | Construction Refurbishment & Fit-Out Framework Contracts | Ardmac | 34 | Open Procedure | €15.0M |
| 6 July 2019 | Archival Repository Project | undisclosed | 5 | Restricted Procedure | - |
| 29 June 2019 | Change Management Consultancy Services for the Consolidation of DCCAE Offices | MovePlan Ireland Limited | 2 | Open Procedure | - |
| 29 June 2019 | Supply and delivery of embankment fill material to the Athlone Flood Alleviation Scheme | undisclosed | 5 | Open Procedure | €162k |
| 23 June 2019 | Service Provider for the Provision of Architectural Technologists to the OPW | undisclosed | - | Open Procedure | €2.0M |
| 6 June 2019 | Tri-axle Low-Loader Trailers | Lynch Trailers | 2 | Open Procedure | - |
| 31 May 2019 | Design, Supply, Installation and Removal of Display Systems, Bespoke Signage, Staging, Backdrops and Mesh Banner Cladding for OPW Event Management Unit | Vinehall Displays | 3 | Open Procedure | €1.0M |
| 21 May 2019 | Design, Supply and Delivery 123m of Reinforced Concrete U-Channel | Croom Concrete | 1 | Open Procedure | - |
| 12 May 2019 | National Concert Hall Redevelopment Programme Fire Engineering Consultant | undisclosed | - | Open Procedure | - |
| 1 May 2019 | Lower Shannon Hydro-geomorphology Study | AquaUoS - University of Salford | 5 | Open Procedure | - |
| 25 April 2019 | Water Level Bubble Sensors | NVM Limited | 3 | Open Procedure | - |
| 17 April 2019 | Technical Supervisory Services | Desmond Rogers | 1 | Open Procedure | €300k |
| 7 April 2019 | National Concert Hall Redevelopment Programme Project Supervisor Design Phase | undisclosed | - | Open Procedure | - |
| 5 April 2019 | Design, supply, installation, testing and certification of sheet piles at the Deerpark Flood Cell on the Athlone Flood Alleviation Scheme | undisclosed | 3 | Open Procedure | - |
| 4 April 2019 | Two 4WD Tractors with Front Loader 126KW (170H.P.) | Armstrong Machinery Ltd | 4 | Open Procedure | €480k |
| 4 April 2019 | Electric Forklift – 2.5 tonne & 4 tonne | Jungheinrich Lift Trucks | 4 | Open Procedure | €190k |
| 2 April 2019 | Ref OPW00003 - REQUEST FOR TENDER FOR THE PROVISION OF THE SUPPLY AND INSTALLATION OF PORTACABINS AT ARDFERT CATHEDRAL, ARDFERT, CO.KERRY | undisclosed | 5 | Open Procedure | - |
| 28 March 2019 | Provision of Architectural Services Provisions for Office of Public Works for Heritage Services | undisclosed | 4 | Open Procedure | - |
| 27 March 2019 | Provision of Electrical Services for the OPW Event Management Unit | J Vaughan Electrical Contractors | 2 | Open Procedure | €500k |
| 23 March 2019 | Multi purpose all-terrain 4x4 Truck, c/w body and 22-metre/tonne crane | Motor Distributors Limited t/a MUTEC | 2 | Open Procedure | €300k |
| 15 March 2019 | Supply and Delivery of Geogrid Materials | Synthetic Packaging | 3 | Open Procedure | - |
| 6 March 2019 | Tender for for the provisions of Interpretation and Exhibition Design for the Blasket Centre, on the Dingle Peninsula, Co. Kerry. | Bright 3D | 3 | Open Procedure | - |
| 1 March 2019 | Supply and delivery of concrete pipe | Condron Concrete Ltd. | 2 | Open Procedure | - |
| 1 March 2019 | Aggregate – River Maine Flood Defence Embankments at Killorglin/Castlemaine and Castleisland, Co. Kerry | MICHAEL CRONIN SAND and GRAVEL LTD | 5 | Open Procedure | - |
| 1 March 2019 | Aggregate – River Feale Flood Defence Embankments | Ardfert Quarry Products | 1 | Open Procedure | - |
| 24 February 2019 | Provision of Temporary Site Services for Stage Hire, Temporary Access, Crowd Control Systems and Bespoke Scaffold Structures for the OPW Event Management Unit | Actavo Events (Ireland) Limited | 3 | Open Procedure | €1.5M |
| 22 February 2019 | 6 x 4 Truck (Tractor Unit) (2 – 3 units) | McDonnell Commercials Ltd | 4 | Open Procedure | €480k |
| 21 February 2019 | Temporary Event Accommodation Structures to include Marquees, Prefabs/Portable Cabins and Temporary Toilets for the OPW Event Management Unit | Eventus | 3 | Open Procedure | €1.5M |
| 20 February 2019 | Audio Visual Services to include Equipment Hire and Audio Visual Technicians | Creative Technology Ireland Ltd | 3 | Open Procedure | €3.0M |
| 20 February 2019 | Health and Safety Services for the OPW Event Management Unit | undisclosed | 4 | Open Procedure | €1.5M |
| 17 February 2019 | Provision of Event Management Services for the OPW Event Management Unit | arcana productions ltd | 9 | Open Procedure | €1.0M |
| 11 February 2019 | Hydromectric Technician Services | JBA Consulting Engineers and Scientists | 1 | Open Procedure | - |
| 10 February 2019 | National Concert Hall Redevelopment Programme - Mechanical & Electrical Engineering Consultancy Services | undisclosed | - | Open Procedure | - |
| 8 February 2019 | National Concert Hall Redevelopment Programme Quantity Surveying Services | undisclosed | - | Open Procedure | - |
| 8 February 2019 | The Supply of Office Pedestal Seating (SD/01/19) | undisclosed | 7 | Open Procedure | €2.0M |
| 4 February 2019 | RFT2019 Provision of Tea Room Services at Ahamore Tearooms Derrynane House Caherdaniel Co Kerry | Deirdre Corridan | 1 | Open Procedure | - |
| 28 January 2019 | Knuckle boom crane | palfinger ireland limited | 1 | Open Procedure | - |
| 18 January 2019 | National Library of Ireland - Measured topographic and building geo-surveys. | undisclosed | 2 | Open Procedure | €800k |
| 18 January 2019 | Provision of Services for Deployment and Operation of Wave Measurement Devices at Tralee and adjacent Bays | AQUAFACT International Services Ltd. | 2 | Open Procedure | - |
| 9 January 2019 | Supply of Granular Materials, Soils and Removal & Disposal of Waste Arisings - River Dodder Flood Alleviation Scheme - Phase 2D and 2E Ballsbridge to Clonskeagh Bridge Area, Dublin. | MacHale Plant Hire Ltd | 3 | Open Procedure | €210k |
| 23 December 2018 | National Concert Hall Redevelopment Programme Civil & Structural Engineering Consultancy Services | undisclosed | - | Open Procedure | - |
| 14 December 2018 | Multi Supplier Framework Agreement for the provision of Surveying Services | Amelio Utilities Ltd | 13 | Open Procedure | €750k |
| 17 November 2018 | The Supply & Installation of Desking, Pedestals &Storage Units | undisclosed | 1 | Open Procedure | €5.0M |
| 14 November 2018 | Maintenance and Support of Alcatel Phone systems | Intercept Technologies | 2 | Open Procedure | - |
| 1 November 2018 | Newcastle West GS Civil & Structural Engineering Consultancy Services | undisclosed | - | Open Procedure | - |
| 27 October 2018 | Newcastle West GS Mechanical & Electrical Consultancy Services | undisclosed | - | Open Procedure | - |
| 26 October 2018 | High Performanace Hydraulic Rock Breaker | undisclosed | 3 | Open Procedure | - |
| 6 October 2018 | Garda Security and Crime Operations Centre, Military Road, Dublin 8 | undisclosed | - | Restricted Procedure | - |
| 30 September 2018 | The Supply of Mattresses, Duvets, and Pillows to Various Places of Detention | undisclosed | - | Open Procedure | €600k |
| 26 September 2018 | Public Sector Data Centre (QS) | undisclosed | 5 | Open Procedure | - |
| 23 September 2018 | Civil and Structural Engineering Consultancy Services for OPW West Region Drainage Maintenance Headquarters | undisclosed | - | Open Procedure | - |
| 16 September 2018 | National Fluvial Mapping Project | undisclosed | 3 | Open Procedure | €400k |
| 14 September 2018 | Procurement of Civil and Structural Engineering Consultancy Service | undisclosed | - | Open Procedure | - |
| 8 September 2018 | Procurement of Mechanical and Electrical Engineering Consultancy Service | undisclosed | - | Open Procedure | - |
| 6 September 2018 | Procurement of Quantity Surveyors Consultancy Service | undisclosed | - | Open Procedure | - |
| 5 September 2018 | Tracked Dumpers | Philip P McCormack (Plant) Ltd | 1 | Open Procedure | €500k |
| 28 August 2018 | Art Project Administration Services | undisclosed | 6 | Open Procedure | - |
| 18 August 2018 | Assistant Civil Engineers in the Flood Relief and Risk Management Services and Flood Risk Management Data Services of the Office of Public Works | undisclosed | - | Open Procedure | €450k |
| 18 August 2018 | Assistant Civil Engineers in the Arterial Drainage Maintenance and Construction Services area of the Office of Public Works including Environment Section | undisclosed | - | Open Procedure | €450k |
| 4 August 2018 | Hydraulic Excavator | undisclosed | 6 | Open Procedure | €840k |
| 4 August 2018 | Environmental Scientists | undisclosed | 1 | Open Procedure | €450k |
| 2 August 2018 | Public Sector Data Centre | undisclosed | 5 | Open Procedure | €30.0M |
| 2 August 2018 | Expert Advice and Support in relation to the Migration and Management of Data in the Office of Public Works | undisclosed | 4 | Open Procedure | €150k |
| 11 July 2018 | Supply & Delivery of Reinforcing Steel to the Athlone Flood Alleviation Scheme (AFAS) Flood Cells 2-5 The Strand, The Quay, Brick Island and Marine View | undisclosed | 1 | Open Procedure | - |
| 2 July 2018 | Fit Out of Office Space for Chief State Solicitors Office | undisclosed | 1 | Open Procedure | - |
| 25 June 2018 | Drainage Pipes | undisclosed | 2 | Open Procedure | €130k |
| 14 June 2018 | Quantity Surveyor Consultancy Services for the Deep Retro-fit Refurbishment of Tom Johnson House | undisclosed | - | Open Procedure | - |
| 12 June 2018 | Supply and haulage of embankment fill material to the Morell River Flood Management Scheme, Co. Kildare | undisclosed | 2 | Open Procedure | €650k |
| 10 June 2018 | Facade/Envelope Design Consultancy Services for Leeson Lane Office Building | undisclosed | - | Open Procedure | - |
| 8 June 2018 | Civil and Structural Engineering Consultancy Services for the Deep Retro-fit Refurbishment of Tom Johnson House | undisclosed | - | Open Procedure | - |
| 31 May 2018 | Supply 4 Wheel Drive Vans | Al Hayes Motors Ltd | 3 | Open Procedure | €420k |
| 29 May 2018 | The Supply of Granular Materials and the Removal/Disposal of Waste Arisings on the Athlone Flood Alleviation Scheme (AFAS), Flood Cells 2-5: The Strand; The Quay; Brick Island; and Marine View | undisclosed | 1 | Open Procedure | - |
| 25 May 2018 | Hydrology, Hydraulics, Coastal Processes and Flood Risk Management Training Programme | JBA Consulting Engineers and Scientists | 2 | Open Procedure | - |
| 16 May 2018 | Steel Fixing Services for the Athlone Flood Alleviation Scheme (AFAS), Flood Cells 2-5: the Strand; the Quay; Brick Island; and Marine View | undisclosed | 3 | Open Procedure | - |
| 23 April 2018 | Water Level Sensors, Water Level / Rainfall Logging and Telemetry Data Transfer Equipment | NVM Limited | 5 | Open Procedure | €225k |
| 18 April 2018 | Provision of Safety Consultancy Services to the Office of Public Works, Hydrometric Section | undisclosed | 4 | Open Procedure | - |
| 15 April 2018 | Forensic Science Ireland | undisclosed | 7 | Restricted Procedure | €60.0M |
| 11 April 2018 | Kilkenny Castle and Parade Tower - Cleaning Services RFT | undisclosed | 1 | Open Procedure | - |
| 29 March 2018 | Altamont House, Co. Carlow - Waste water treatment plant and percolation system | Dunne Brothers Ltd | 1 | Open Procedure | - |
| 13 March 2018 | Supply and delivery of ready mixed concrete to the Athlone Flood Alleviation Scheme, Flood Cells 2-5 | undisclosed | 1 | Open Procedure | €221k |
| 21 February 2018 | OPW Measured Term Maintenance Contract - Dublin (City & County) | undisclosed | - | Restricted Procedure | €15.0M |
| 16 February 2018 | Supply of Hydraulic Excavators | undisclosed | 7 | Open Procedure | €5.4M |
| 26 January 2018 | Emo Court Phase 03 Works – Toilets, Groundworks and Works to House | Frank C Murray and Sons Construction Ltd | 2 | Open Procedure | - |
| 9 January 2018 | Quanitiy Surveyor Consultancy Services for Leeson Lane Office Building | undisclosed | - | Open Procedure | - |
| 2 January 2018 | Emo Court – Phase 2 (Installation Waste Water Treatment System) Tender for Main Contractor | Dunne Brothers Ltd | 1 | Open Procedure | - |
| 22 December 2017 | Framework for Architectural Services (including PSDP, Assigned Certifier & Design Certifier) for projects with an estimated construction cost of €2 million or less (ex. VAT) | undisclosed | 76 | Open Procedure | €6.0M |
| 22 December 2017 | Framework for Architectural Services (including PSDP, Assigned Certifier & Design Certifier) for projects with an estimated construction cost in excess of €2 million (ex. VAT) | undisclosed | 63 | Open Procedure | €6.0M |
| 21 December 2017 | Civil and Structural Engineering Consultancy Services for Leeson Lane Office Building | undisclosed | - | Open Procedure | - |
| 20 December 2017 | Expert Advice and Support in the Implementation of IBM Tririga in the Office of Public Works | undisclosed | 2 | Open Procedure | €700k |
| 15 December 2017 | Provision of a collection/transfer of furniture, environmental disposal service. | undisclosed | - | Open Procedure | €500k |
| 19 November 2017 | Enterprise Architect Consultancy Services in relation to the utilisation of the Sparx Systems Application in the Office Of Public Works | undisclosed | 3 | Open Procedure | €150k |
| 3 November 2017 | Quantity Surveying Consultancy Services for the redevelopment of Fitzgibbon Street Garda Station | undisclosed | - | Open Procedure | - |
| 11 October 2017 | Civil and Structural Engineering and Project Supervisor Design Process Consultancy Services for the redevelopment of Fitzgibbon Street Garda Station | undisclosed | - | Open Procedure | - |
| 28 September 2017 | Migration of a Kopano Email system to Microsoft Exchange | SureSkills | 1 | Open Procedure | €150k |
| 21 September 2017 | Phoenix Park Dublin Bicycle Hire Concession | undisclosed | 1 | Open Procedure | - |
| 18 September 2017 | Request for Tenders for the Supply of Acoustic Doppler Flow Measurement Devices | Xylem Analytics UK Ltd | 1 | Open Procedure | - |
| 30 August 2017 | Provision of Civil & Structural Engineering Sevices | undisclosed | 1 | Open Procedure | - |
| 21 August 2017 | Provision of Quantity Surveying Consultancy Services | undisclosed | - | Open Procedure | - |
| 27 July 2017 | Provision of an on-site ICT support staff at OPW Trim and Dublin Offices | undisclosed | 5 | Open Procedure | €2.0M |
| 2 July 2017 | Raphoe Flood Relief Scheme Engineering Consultants | undisclosed | - | Open Procedure | €200k |
| 12 June 2017 | Roof works at Altamont House, Altamont Gardens, Tullow, Co. Carlow | Tallis and Co. Ltd. | 1 | Open Procedure | - |
| 9 June 2017 | Quantity Surveying Consultancy Service and Contract Administration Service (combined) including the Role of Project Supervisor Design Process for Measured Term Maintenance Contract in Dublin City | Carron + Walsh Construction Consultants Ltd | 1 | Open Procedure | - |
| 31 May 2017 | Supply & Delivery of pipe bedding and trench backfill material for Templemore Flood Relief Scheme, Co. Tipperary | Campion's Quarry Ltd | 1 | Open Procedure | - |
| 24 May 2017 | Provision of Services for Development of a Detailed Tidal, Storm Surge and Wave Forecasting System for the South West Coast of Ireland at Tralee and adjacent Bays | undisclosed | 4 | Open Procedure | €120k |
| 14 May 2017 | Provision of Environmental Services related to Arterial Drainage Maintenance Services and to the provision of Flood Risk Management Schemes | undisclosed | 9 | Open Procedure | €1.0M |
| 19 April 2017 | Ballymakeery/Ballyvourney Flood Relief Scheme Ground Investigation Contract | Priority Geotechnical Limited | 1 | Open Procedure | - |
| 5 April 2017 | Communications Services to OPW | undisclosed | 1 | Open Procedure | €600k |
| 4 April 2017 | Construction of a new Forensic Science Laboratory in Backweston Co. Kildare | undisclosed | - | Restricted Procedure | €60.0M |
| 19 January 2017 | Supply and delivery of Geotextile and Geogrid product for ongoing Flood Defence Embankment Works in Co. Kerry, Co. Clare and Co. Limerick | Irish Tar | 5 | Open Procedure | - |
| 19 January 2017 | Supply and delivery of Subsoil Material for the River Maine Flood Defence Embankments at Callinafercy, Milltown, Co. Kerry & Gurrane, Killorglin, Co. Kerry | Gerard Naughton and Sons Ltd | 4 | Open Procedure | - |
| 19 January 2017 | Clean Angular 4" - 6" Crushed Stone, Blinding and 4" down Stone required for the Construction & Maintenance of an Access Haul Road adjacent to the River River Maine Flood Defence Embankments at C | Michael F. Quirke and Sons | 3 | Open Procedure | - |
| 19 January 2017 | Clean Angular Rock Armor for the Construction & Maintenance of River Bank Erosion Control Measures along the River Maine Drainage Scheme at Castleisland, Springmount, Gurrane and Callinafercy, Co | Ardfert Quarry Products | 4 | Open Procedure | - |
| 9 January 2017 | Framework for the provision of Engineering Consultancy Services for Flood Risk Management Projects | Arup | 22 | Open Procedure | €21.0M |
| 3 January 2017 | Supply of Granular Materials, Soils and Removal & Disposal of Waste Arisings for the River Dodder Flood Alleviation Scheme - Phases 2C, 2D and 2E | MacHale Plant Hire Ltd | 1 | Open Procedure | - |
| 22 December 2016 | Clonakilty FRS - River Fealge(Clonakilty) Certified Drainage Scheme -Civil Works Contract | Ward and Burke Construction Ltd. | 1 | Open Procedure | €10.0M |
| 2 September 2016 | Acoustic Doppler Flow Measurement Devices | Xylem Analytics UK Ltd | 2 | Open Procedure | - |
| 31 August 2016 | Flood Risk Management Environmental Training | JBA Consulting Engineers and Scientists | 1 | Open Procedure | - |
| 29 August 2016 | Supply and installation of desking, pedestals and storage units (DL-30-16) | undisclosed | - | Open Procedure | €5.0M |
| 19 August 2016 | Supply of Crane Hire Services - Bettystown Flood Alleviation Scheme , Co Meath | O Grady Crane Hire Ltd | 1 | Open Procedure | - |
| 22 July 2016 | Design, Fabrication and Supply of Precast Concrete Units, Bettystown Flood Relief Works | Stresslite | 1 | Open Procedure | - |
| 21 July 2016 | Supply of Office Pedestal Seating (DL/28/16) | undisclosed | - | Open Procedure | €300k |
| 4 July 2016 | Water level sensors, Water level/Rainfall Logging and Telemetry Data Transfer Equipment. | NVM Limited | 1 | Open Procedure | €225k |
| 10 June 2016 | Invasive species treatment works along the banks of the River Bride and Glenmought River of areas where flood relief works are proposed. | All About Trees Ltd | 1 | Open Procedure | - |
| 3 June 2016 | Step- Frame 4-axle Semi-trailer | Ashbourne Truck Centre | 1 | Open Procedure | - |
| 3 June 2016 | Fuel Management System for the OPW | Permark Pumps Ltd. | 5 | Open Procedure | - |
| 20 May 2016 | Historic Leinster House Refurbishment Project | undisclosed | 1 | Restricted Procedure | €8.0M |
| 4 May 2016 | Expert Advice and Support in the Procurement of an Integrated Workplace Management System | undisclosed | 2 | Open Procedure | - |
| 15 April 2016 | Procurement of Integrated Workplace Management System by the OPW | undisclosed | 5 | Restricted Procedure | €1.0M |
| 22 March 2016 | QUANTITY SURVEYING SERVICES HISTORIC LEINSTER HOUSE | undisclosed | - | Open Procedure | €135k |
| 18 March 2016 | Provision of Quantity Surveyor Services for works on Athlone Garda Station | undisclosed | - | Restricted Procedure | - |
| 16 October 2015 | Access Layer Switch Replacemet | NTT Ireland Limited | 1 | Open Procedure | - |
| 28 August 2015 | RFT for 2 Business Analysts, OPW | emagine Expertise Ltd trading as emagine | 6 | Open Procedure | - |
| 28 August 2015 | RFT for Oracle Database Programmer, OPW | IT Alliance Group | 2 | Open Procedure | - |
| 5 August 2015 | Maintenance and Support of Alcatel Phone systems | NTT Ireland Limited | 1 | Open Procedure | - |
| 29 July 2015 | SERVICE PROVIDER FOR MECHANICAL & ELECTRICAL BUILDING SERVICES ENGINEERING & CAD RESOURCES | undisclosed | 3 | Open Procedure | €900k |
| 28 July 2015 | Provision of the services of Chartered Civil Engineers | undisclosed | - | Open Procedure | - |
| 7 July 2015 | Provision of Subscriptions Management Service | LM Tietopalvelut Oy | 3 | Open Procedure | €176k |
| 21 April 2015 | Architectural Consultancy Services | undisclosed | 1 | Open Procedure | - |
| 15 April 2015 | Mechanical and Electrical Engineering Consultancy Service | undisclosed | 1 | Open Procedure | - |
| 10 April 2015 | Quantity Surveying Consultancy Services | undisclosed | 1 | Open Procedure | - |
| 7 November 2014 | Pathworks, Rose Garden, National Botanic Gardens | undisclosed | 1 | Open Procedure | - |
| 10 October 2014 | The Removal & Environmental Disposal of Existing Floorcovering and the Supply and Installation of Carpet Tiles | Treflor | 1 | Open Procedure | - |
| 8 October 2014 | Supply, Fitting and Repair of Roller Blinds at Garda College, Templemore, Co. Tipperary | TM Blinds Ltd | 1 | Open Procedure | - |
| 6 October 2014 | Sprinkler Maintenance Contract | Writech Industrial Services Ltd | 2 | Open Procedure | - |
| 3 October 2014 | Sprinkler Maintenance Services | Writech Industrial Services Ltd | 2 | Open Procedure | - |
| 30 September 2014 | Supply and Installation of Manual Mobile Shelving | NEW AGE STORAGE SYSTEMS LTD | 1 | Open Procedure | - |
| 28 September 2014 | Development at Mrs. Annan Bryce's Cottage, Garinish Island (Ilnacullin), Glengarriff Harbour, Co Cork. | Cahalane Bros Ltd | 1 | Open Procedure | - |
| 25 September 2014 | Supply and Installation of Courtroom Furniture | Fitzgeralds Of Kells | 1 | Open Procedure | - |
| 18 September 2014 | Internal Fit - out of an existing 3 storey building over basement building | Mythen Construction Ltd | 1 | Open Procedure | - |
| 12 September 2014 | Supply of Beam Seating on a drawdown basis | Thomas Montgomery Limited | 1 | Open Procedure | - |
| 8 September 2014 | Supply of Water Level Sensors | Hydro International UK Ltd | 1 | Open Procedure | - |
| 27 August 2014 | Supply & Installation of Manual Mobile Shelving to Dept Social Protection, Ennis | Storage Systems Ltd | 1 | Open Procedure | - |
| 1 August 2014 | Nurses Building Leeson Lane Refurbishment | undisclosed | 1 | Restricted Procedure | - |
| 21 July 2014 | Supply and Installation of electrical metering equipment | Blackbourne Limited Trading as Blackbourne Integrated MandE | 21 | Open Procedure | - |
| 29 May 2014 | Kevin Street Garda Divisional HQ - Phase 2 - Main Contractor Prequalification | undisclosed | 1 | Restricted Procedure | - |
| 12 May 2014 | Subscriptions Management Service | undisclosed | 3 | Open Procedure | - |
| 27 March 2014 | 18 Tonne 4WD Tipper Truck with Crane | undisclosed | 2 | Open Procedure | - |
| 8 January 2014 | THE PROVISION OF FACILITIES MANAGEMENT SERVICES THE STATE LABORATORY AND THE DEPARTMENT OF AGRICULTURE, FOOD AND THE MARINE BACKWESTON CAMPUS, CELBRIDGE, CO. KILDARE, THE STATE FARM, LONGTOWN, CO | undisclosed | 1 | Open Procedure | - |
| 26 November 2013 | Renewal of its McAfee ePolicy Orchestrator licensing, support & maintenance. | undisclosed | 2 | Open Procedure | - |
| 21 November 2013 | The Collection/Transfer of Furniture, Environmental Disposal & Recycling Service | Beverly Smyth | 1 | Open Procedure | - |
| 19 November 2013 | Upgrade Net App SAN disk shelves | undisclosed | 1 | Open Procedure | - |
| 12 November 2013 | Wan Links Castlebar | undisclosed | 2 | Open Procedure | - |
| 8 October 2013 | Tender for Licensing, Maintenance and Support of Websense Web Security Gateway | undisclosed | 2 | Open Procedure | - |
| 27 September 2013 | Provision of Servers | undisclosed | 5 | Open Procedure | - |
| 9 September 2013 | Athlone D.O.Wan Links | undisclosed | 3 | Open Procedure | - |
| 28 August 2013 | Support for Cisco ASR Routers | undisclosed | 4 | Open Procedure | - |
| 28 August 2013 | LAN speed WAN connectivity between Government Buildings, Hebron Road. Kilkenny | undisclosed | 3 | Open Procedure | - |
| 19 June 2013 | Alcatel Network Infrastructure | undisclosed | 1 | Open Procedure | - |
| 5 June 2013 | Provision of Large Format Scanning of Architectural Drawings and the Creation of Associated Metadata | undisclosed | 6 | Open Procedure | - |
| 4 June 2013 | LAN speed WAN connectivity between OPW Lifford Arterial Drainage, Gallows Brae,Lifford, Co. Donegal | undisclosed | 4 | Open Procedure | - |
| 4 June 2013 | LAN speed WAN connectivity OPW Swiss Cottage, Kilcommon, Cahir, Co. Tipperary | undisclosed | 4 | Open Procedure | - |
| 30 May 2013 | WAN services Ballina | undisclosed | 5 | Open Procedure | - |
| 30 May 2013 | LAN speed WAN connectivity between the Blaskets Centre | undisclosed | 2 | Open Procedure | - |
| 30 May 2013 | WAN connectivity between OPW Letterkenny District Office | undisclosed | 4 | Open Procedure | - |
| 30 May 2013 | LAN speed WAN connectivity between OPW Charles Fort, SummerCove, Kinsale, Co. Cork | undisclosed | 4 | Open Procedure | - |
| 27 May 2013 | San Tender | undisclosed | 1 | Open Procedure | - |
| 7 May 2013 | Wan Links Galway | undisclosed | 6 | Open Procedure | - |
| 7 May 2013 | Wan Links Claremorris | undisclosed | 3 | Open Procedure | - |
| 7 May 2013 | Wan Links Mungret | undisclosed | 6 | Open Procedure | - |
| 7 May 2013 | Wan Links Sligo | undisclosed | 6 | Open Procedure | - |
| 7 May 2013 | Wan Links Mallow | undisclosed | 4 | Open Procedure | - |
| 7 May 2013 | Wan Links Waterford | undisclosed | 5 | Open Procedure | - |
| 3 May 2013 | Wan Links Headford | undisclosed | 4 | Open Procedure | - |
| 2 May 2013 | Request for Tenders for the Provision of Catering Services at 51 / 52 St Stephen's Green, Dublin 2 | undisclosed | 5 | Open Procedure | - |
| 2 April 2013 | WAN Links Rock of Cashel | eircom Limited (t/a eir business) | 4 | Open Procedure | - |
| 2 April 2013 | WAN links Clonmacnoise | undisclosed | 3 | Open Procedure | - |
Open-market vs limited-competition mix · average bids · SME-access ratio
Procurement Intelligence
The Office of Public Works (OPW) is an Irish government office responsible for managing the State’s property portfolio, delivering and maintaining public buildings, protecting and presenting heritage sites, and implementing major flood-risk management and drainage programmes. Its procurement profile spans construction and building services, environmental and flood-management works, facilities maintenance, surveying and other professional services, visitor-services goods, transport-related works, and specialist IT and geospatial services. Recent eTenders notices indicate demand for electrical and mechanical building-services works, glazing replacement, construction and maintenance services, drone surveying, GIS expertise, and multidisciplinary professional services. The supplied pipeline indicates 25 currently open tenders with a combined estimated value of €9,341,012.
Strategic Context
OPW purchasing is shaped by continued investment in public-building maintenance, heritage-site conservation, climate adaptation and flood-relief infrastructure, alongside the operation of a large national property and visitor-attraction estate. Current tender activity suggests a mix of planned multi-year building-services requirements and specialist capability needs, including national drone surveying and GIS support; several works contracts specify terms of up to 48 months. Publicly indexed results available for this review did not provide a sufficiently reliable current OPW-specific budget figure or a confirmed new procurement strategy, so those details should be verified against the latest Revised Estimates, OPW annual material and eTenders notices.
Typical Suppliers
- Building and civil-engineering contractors, including regional construction firms such as John Crean Construction Ltd and Richard McEvoy Contracting Ltd
- Mechanical, electrical and general building-services contractors capable of delivering multi-site maintenance frameworks
- Specialist fabric and external-maintenance providers, including glazing, power-washing, roofing and related conservation trades
- Surveying, GIS, drone-mapping and environmental consultancies, including providers able to support nationally coordinated data collection
- Design, engineering, heritage-conservation and multidisciplinary professional-services practices supporting OPW visitor sites and capital works
Supplier Tips
- Monitor OPW notices on eTenders by authority name and relevant CPV categories, and register interest early in multi-year building-services, surveying and maintenance opportunities; recent notices require electronic submission through eTenders.
- Demonstrate capacity for public-sector compliance, health and safety, quality assurance, insurance, environmental management and delivery across multiple Irish locations, rather than presenting only project-specific credentials.
- Use prior OPW or comparable public-estate references and clearly evidence specialist capability in areas such as heritage-sensitive works, flood resilience, GIS, drone surveying or planned preventative maintenance.
Updated 27 September 2026
Office of Public Works (OPW) market guides
How Office of Public Works (OPW) buys, broken down by sector: award patterns, top suppliers, and bid-readiness steps.
Other major buyers
2 new Office of Public Works (OPW) tenders published in the last 14 days. Subscribers receive these in the weekly Monday digest.
- Geogrid and Geotextile Materials for Constructing Access Haul Roads and Flood Defence Earthen Embankments for the Office of Public Works, South West Region2026-10-13
- Procurement of Works Contractor (Including PSCS) for Conservation and Adaptation of 14-17 Moore St, Dublin 1 and provision of New Visitor Facility at 8-9 Moore Lane, Dublin 12026-10-12
Get alerts when Office of Public Works (OPW) publishes new tenders
TenderWatch Pro
Track this buyer's upcoming tenders and expiring contracts
Unlock the full Contract Expiry Radar (450+ contracts over EUR 100k ending in the next 6 months), weekly matched tender alerts, and one-click CSV exports. EUR 49 a month, cancel any time.
See TenderWatch ProLast updated 20 October 2026. Award dataset coverage begins 2013-04-02. Sentinel TED values (€0, €1) are excluded from totals and averages.