ATU Single Operator Framework Agreement Call Out Minor Works Under 6 Lots
Awarded by Atlantic Technological University · Published 7 September 2022 · Ends 7 September 2026
3 awards totalling €2.2M have been heuristically linked to this framework in 2026.
Linkage is computed from same-authority + shared 4-digit CPV-prefix + award-date inside the framework window: no foreign key exists on TED award notices, so confidence is high.
Download 3 heuristically-linked call-off awards
CC BY 4.0 · sourced from TEDEndpoints are public, no auth. Columns and shape are pinned — see about Tenderwatch for the contract.
3
Linked awards
€2.2M
Disclosed value
3
Distinct suppliers
-
Lots
Top suppliers winning under this framework
- 1.Rhatigan and Company architects1 · €1.6M
- 2.Walsh Mechanical Engineering Ltd1 · €501k
- 3.Taylor McCarney Architects1 · €72k
Year-by-year
| Year | Awards | Value |
|---|---|---|
| 2026 | 3 | €2.2M |
By value band
- €50k-€144k1 · €72k
- €360k-€1M1 · €501k
- €1M-€5M1 · €1.6M
Most recent call-off awards (3 of 3)
| Date | Title | Winner | Value |
|---|---|---|---|
| 24 June 2026 | Atlantic Technological University Galway City Dublin Road Campus Contract for Works to replace the Heating Distribution Network Phase 5 | Walsh Mechanical Engineering Ltd | €501k |
| 6 May 2026 | led integrated Design Team for the design, construction and fit out of a Veterinary Facility at Atlantic Technological University (ATU), Letterkenny, Co. Donegal | Rhatigan and Company architects | €1.6M |
| 24 April 2026 | University Connemara Architect Led Integrated Design Team Services for Carpentry and Joinery Apprenticeship Expansion 2026 | Taylor McCarney Architects | €72k |
Watch this framework
Get an alert inside your weekly Tenderwatch digest when ATU Single Operator Framework Agreement Call Out Minor Works Under 6 Lots produces new call-off activity or shows a renewal signal. Free. The state publishes call-off data with a delay, so treat this as incumbency and renewal intelligence rather than same-day news.
Last updated 11 August 2026. Linkage is heuristic - see /awards/by-framework for the rule. Award dataset coverage begins 2026-04-24.