Remediation Works at Ardara Bridge National Monument Cadamstown Co.

Deadline

5 May 2026

Verify on the official notice, TED times are not authoritative.

Estimated Value

€834k

Value Range

500k-1M

Procedure

Not specified

Procurement Type

Works

Published

2026-03-26

Resource ID

209851-2026

CPV Classification

Common Procurement Vocabulary: the EU codes that classify what this contract is for.

  • 45221100Construction work
  • 45000000Construction work
  • 45262210Construction work
  • 45112300Construction work
  • 45112400Construction work
  • 45453000Construction work
  • 92522000Recreational, cultural and sporting services
  • 92522100Recreational, cultural and sporting services

Summary

In summary, the works involved in this project generally consist of the following: • Installation of self-drilling soil nails and mesh to stabilise the failed slope. • Excavation of failed slope and removal of the existing gabion baskets on site, including provision of temporary works propping to support steel arch frame which has one leg erected on the gabions.

Construction of a new foundation for the failed wing wall. • Extension of the soils and installation of mesh to re-build embankment to required height.

This will be typical of a reinforced soil embankment with mesh finishing using a ‘bottom-up’ construction sequence • Installation of horizontal drains to allow groundwater to drain from the slope. • Construction of new masonry wing wall.

Extending top of existing walls on site. • Surface finishing.

Reinstatement, pointing and general repair work as required. The works will be completed on the downstream side of the bridge only with no disturbance to the existing conditions on the northern side which is considered in good condition.

The Contractor shall provide all labour and plant resources for construction of the Works unless otherwise stated. All temporary works and access are the responsibility of the contractor The Contractor shall note that due to the requirement to work on steep side slopes considerable temporary works may be required to ensure the works are done in a safe manner.

The Contractor shall supply all materials required for the temporary and permanent Works. The Contractor shall include for the costs of these temporary works, including design, in their rates and prices.

Keywords

remediationworksatardarabridge
Open eTenders CFT WorkspaceView Official Notice
3 FREE LOOKUPS / MONTH WITH SIGN-INPREVIEW · 2 OF 4 SIGNALS VISIBLE
TENDER DOSSIER · 209851-2026 · CPV 45PREVIEW · 2 OF 4 SIGNALS VISIBLE

Remediation Works at Ardara Bridge National Monument Cadamstown Co.

Buyer & BenchmarkOffice of Public Works (OPW) · CPV 45 median award €357,123 (IQR €120,472 to €1,372,205, n=1,580) · Median 4 bids
Notice ProfileSector: Construction · Deadline: 2026-05-05
Pre-Qualification & CROFull CRO status, B1 accounts date, NACE classification, and ESPD pre-qualification check for Construction bidders
Buyer Spend & HistoryAll Office of Public Works (OPW) contract awards -> · Browse >EUR 20k supplier payment register ->

Sign in to unlock

Get 3 free lookups a month and a copy sent to your inbox.

or 1-click sign in

Procurement-ready software

Suppliers bidding on Construction tenders often need compliant Irish software. Compare verified options:

Irish compliance verified, Revenue, PAYE, GDPR. Powered by Vendors.ie

Looking for grants too?Browse Irish business supports