| Provision of Programme Oversight and Assurance Services in relation to the MetroLink Programme | National Transport Authority | >5M | TBC |
| Bremore Ireland Port | Bremore Ireland Port DAC | 500k-1M | TBC |
| Heavy Civils Enabling Works (Call-off contracts with an estimated value of €50 million or more (excluding VAT) | Transport Infrastructure Ireland (TII) | >5M | TBC |
| Clúid Design and Build Contractor Framework - Residential developments in excess of €50million Nationwide | Clúid Housing Association | >5M | TBC |
| 9916 Nationwide Biodiversity Map, Measure and Score Project | Iarnród Eireann-Irish Rail | 500k-1M | TBC |
| 8962 - Lubricant Analysis - Sampling and Reporting | Iarnród Eireann-Irish Rail | 500k-1M | TBC |
| M190 - Specialist Heritage Contract | Transport Infrastructure Ireland (TII) | >5M | TBC |
| Multi-Party Framework Agreement for provision of Engineering Consultancy and PSDP Services for Building Services Projects (2026-2030) | Cork City Council | 500k-1M | TBC |
| Engineering and Environmental Consultancy Services for Nenagh Flood Relief Scheme | Tipperary County Council | 1M-5M | 2 Sept 20261d left |
| Request for Tender for Architect Led Multi-Disciplinary Design and Cost Management Team for New Airfield Vehicle Entry Screening Post, Associated Infrastructure and Ancillary Works at Shannon Airport | Shannon Airport Authority DAC | <25k | TBC |
| FCC/235/26 - Multi-Party Framework Agreement for the Delivery of Public Realm Infrastructure within the Fingal County Council Administrative Area both employer designed and contractor designed | Fingal County Council | >5M | TBC |
| 26-011 Ballymore Eustace to Saggart Reservoir Resilience Project | Uisce Éireann | <25k | TBC |
| Lot 1 Heavy Civils Enabling Works for Call-off Contracts with an estimated value of €50 million or more (excluding VAT) and those determined by the Contracting Authority to be complex call-off contracts of any value which may require specific technical or specialist resources. | Transport Infrastructure Ireland (TII) | >5M | TBC |
| 9163 Single Supplier Framework Agreement for Design and Build Civil and Structural Contractor for DART+ | Iarnród Eireann-Irish Rail | >5M | TBC |
| Dublin Region | Electricity Supply Board ( ESB ) | 1M-5M | TBC |
| Engineering and Environmental Consultancy Services for Nenagh Flood Relief Scheme | Tipperary County Council | 1M-5M | 2 Sept 20261d left |
| Professional Services for the preparation of a Masterplan for Castletown Estate and Donaghcumper Estate and their historic landscapes | Office of Public Works (OPW) | 100k-500k | 3 Sept 20262d left |
| Dublin Region | Electricity Supply Board ( ESB ) | 1M-5M | TBC |
| Clúid Design and Build Contractor Framework - Residential developments in excess of €50million Nationwide | Clúid Housing Association | >5M | TBC |
| Dublin Region | Electricity Supply Board ( ESB ) | 1M-5M | TBC |
| T.042.2026 Garden Maintenance Service Limerick Division | An Garda Síochána | 25k-100k | 2 Sept 20261d left |
| Engineering Technical Consultancy Services for the Thurles Inner Relief Road | Tipperary County Council | 1M-5M | 3 Sept 20262d left |
| Multi-Party Framework for the Provision of Site Investigation Services (Pro192) | The Land Development Agency | 1M-5M | 3 Sept 20262d left |
| Sustainable energy policy research, programme evaluation, and economic analysis | Sustainable Energy Authority of Ireland | >5M | 4 Sept 20263d left |
| Provision of End to End Scheme Design for a National District Heat Grant Scheme | Sustainable Energy Authority of Ireland | 100k-500k | 4 Sept 20263d left |
| Civil Engineering Led Consultancy Team | Roscommon County Council | 100k-500k | 4 Sept 20263d left |
| EWS 2026 - Invitation to Tender for Building Services (mechanical] Consultancy Services for Heating Upgrade project at Ardscoil La Salle school, Raheny Road, Raheny, Dublin 5 | Ardscoil La Salle | 1M-5M | 4 Sept 20263d left |
| PROVISION OF RADON TESTING OF PROPERTIES FOR GALWAY COUNTY COUNCIL | Galway County Council | 100k-500k | 4 Sept 20263d left |
| Carrick on Shannon Parks Project (Transformation of 4 Urban Green Areas) in Carrick on Shannon, Co Leitrim | Leitrim County Council | 500k-1M | 7 Sept 20266d left |
| Ballycoolin Bus Depot Design and Build | National Transport Authority | >5M | TBC |
| Bremore Ireland Port | Bremore Ireland Port DAC | 500k-1M | TBC |
| Establishment of a Multi-Party Framework for Consultancy Services for Strategic Environmental Assessment and Appropriate Assessment of Limerick City and County Council Plans with an Initial Contract | Limerick City and County Council | 100k-500k | 2 Sept 20261d left |
| Monitoring Services | Department of Climate Energy and the Environment | 1M-5M | 4 Sept 20263d left |
| Consultancy Services for Main Pier Repair Works at An Daingean Fishery Harbour Centre, Dingle, Co. Kerry | Department of Agriculture Food and the Marine | 25k-100k | 4 Sept 20263d left |
| Establishment of a Multi-Party Framework for Consultancy Services for Flood Risk Assessments (SFRAs) to inform Limerick City and County Council Plans with an Initial Contract | Limerick City and County Council | 100k-500k | 4 Sept 20263d left |
| ILV Granuaile Obsolescence Review | Commissioners of Irish Lights | 25k-100k | 4 Sept 20263d left |
| Tender for The Supply and Delivery of Health and Safety Software Services at Mary Immaculate College (MIC) | Mary Immaculate College | 25k-100k | 7 Sept 20266d left |
| The provision of Seismic Survey Acquisition Services to Geological Survey Ireland | Department of Climate Energy and the Environment | 100k-500k | 8 Sept 20267d left |
| The Connection of Letterbrick to the Public Water Supply | Donegal County Council | 100k-500k | 9 Sept 20268d left |
| Mountmellick Flood Relief Scheme - Site Investigation | Laois County Council | 100k-500k | 9 Sept 20268d left |
| Bivalent Heat Pump System Installation - Strokestown Park House, Co. Roscommon | Irish Heritage Trust | <25k | 9 Sept 20268d left |
| Sustainable energy policy research, programme evaluation, and economic analysis | Sustainable Energy Authority of Ireland | >5M | 9 Sept 20268d left |
| UL1080 - Project Management Consultant for LISB1 Refurbishment (Library) University of Limerick | University of Limerick | 25k-100k | 9 Sept 20268d left |
| UL1078 - Architectural Services including Exhibition Design Consultant, Fire and DAC Consultant for LISB1 Refurbishment (Library) University of Limerick | University of Limerick | 100k-500k | 9 Sept 20268d left |
| **SIGNPOST TO eTENDERSNI CfT_6638777 Appointment of ICT for Bleary Mini Digi Hub PEACEPLUS Project ** | Armagh City, Banbridge and Craigavon Borough Council | 25k-100k | 9 Sept 20268d left |
| Single Party Framework Agreement for the Software Development Resources and Services | Horse Racing Ireland (HRI) | 1M-5M | 10 Sept 20269d left |
| ER / TA Services | National Development Finance Agency | 1M-5M | 10 Sept 20269d left |
| Civil Engineering Led Consultancy Team | Roscommon County Council | 25k-100k | 10 Sept 20269d left |
| Civil/Structural/Hydraulic Engineering Services | Inland Fisheries Ireland | >5M | 11 Sept 202610d left |
| HSE Dublin and North East | Health Service Executive (HSE) | 1M-5M | 11 Sept 202610d left |
| Monitoring Services | Department of Climate Energy and the Environment | 1M-5M | 11 Sept 202610d left |
| Visualisation Services in support of the National Designated Maritime Area Plan (DMAP) for Offshore Renewable Energy (ORE) | Department of Climate Energy and the Environment | 100k-500k | 11 Sept 202610d left |
| Consultancy Services to produce a Development Masterplan at the Defence Forces Training Centre (DFTC) The Curragh, Co. Kildare incl. DFTC Training Installation Staff Coolmoney and Glen of Imaal (TISC) | Department of Defence | <25k | 11 Sept 202610d left |
| Archaeological Consultancy Services for the Development of a new Post Primary School for Gaelcholáiste Phort Láirge, Ballygunner, Co Waterford | Department of Education and Youth | 25k-100k | 11 Sept 202610d left |
| Mechanical Works to St. Marys JNS, Blessington, Co. Wicklow | St. Mary's Junior National School (Blessington) | 100k-500k | 11 Sept 202610d left |
| Development of a New NPWS Visitor Park Centre for The Burren National Park | Department of Housing Local Government and Heritage | >5M | 11 Sept 202610d left |
| EST_MW - Economic and Cost Consultancy Services - St. John's Hospital, Limerick Bed Capacity Expansion Project | Health Service Executive (HSE) | 25k-100k | 13 Sept 202612d left |
| CFT 3991 - Transport Led Multidisciplinary Consultancy Services | South Dublin County Council | 100k-500k | 14 Sept 202613d left |
| Letterkenny Northern Network Project - Ground Investigation Contract | Donegal County Council | 100k-500k | 14 Sept 202613d left |
| Single Party Framework Agreement for Prison Service Strategic and Technical Professional Services | Irish Prison Service | 1M-5M | 14 Sept 202613d left |
| Lot 1 Masterplan for the proposed Variation for the Limerick Development Plan | Limerick Twenty Thirty DAC | 1M-5M | 14 Sept 202613d left |
| UL1080 - Project Management Consultant for LISB1 Refurbishment (Library) University of Limerick | University of Limerick | 25k-100k | 14 Sept 202613d left |
| UL1078 - Architectural Services including Exhibition Design Consultant, Fire and DAC Consultant for LISB1 Refurbishment (Library) University of Limerick | University of Limerick | 100k-500k | 14 Sept 202613d left |
| Gas and Electricity Infrastructure Technical Services | Sustainable Energy Authority of Ireland | 100k-500k | 15 Sept 202614d left |
| A11The provision of engineering and technical support in the maintenance and installation of electro-optical control systems for the Irish Naval Service | Irish Defence Forces | 1M-5M | 15 Sept 202614d left |
| UL1081 - Building Services Engineer (Mechanical and Electrical) for LISB1 Refurbishment (Library) University of Limerick | University of Limerick | 25k-100k | 15 Sept 202614d left |
| Greenway Feasibility: 2026 Shannon Harbour to Banagher, Co Offaly | Offaly County Council | 25k-100k | 15 Sept 202614d left |
| Category 1: Advanced Technical and Digital Engineering | Engineering Skillnet | 500k-1M | 16 Sept 202615d left |
| Consultant Quantity Surveying Services for the Refurbishment, Fitout and Historic Building Retrofit of Aras Mhic Dhiarmada / Busaras, Store St, Beresford Place, Dublin 1 | Office of Public Works (OPW) | <25k | 16 Sept 202615d left |
| Meath Co Co - MH-RREG-26-05 - Architectural - Led Consultancy Services -Planning Support, Early Contractor Engagement/ Procurement Support for MCC extension | Meath County Council | 1M-5M | 16 Sept 202615d left |
| Asbestos Roof Removal, Roof Replacement, Solar PV, Battery Storage and Smart Energy Control System at Athy Rugby Club | Athy Rugby Football Club | 100k-500k | 16 Sept 202615d left |
| Feasibility Study – Dunmore Landfill Gas Flare and Civic Amenity Site, Kilkenny | Kilkenny County Council | <25k | 16 Sept 202615d left |
| R250 – Droichead an Churraoin Road Realignment Ground Investigation Contract 2026 | Donegal County Council | <25k | 16 Sept 202615d left |
| 2026 Emergency Works for Mechanical and Electrical Consultant at Good Council Secondary School New Ross Wexford | Good Counsel College (New Ross) | <25k | 16 Sept 202615d left |
| Mountrath Town Centre Public Realm Improvement Scheme | Laois County Council | 100k-500k | 17 Sept 202616d left |
| Provision of Landscape Architect at the former Ballitore Garda Station, Barrack Road, Ballitore,Co. Kildare | Kildare County Council | <25k | 17 Sept 202616d left |
| Tree Condition Survey at at the site of the former Ballitore Garda Station, Barrack Road, Ballitore, Co.Kildare. | Kildare County Council | <25k | 17 Sept 202616d left |
| Mountrath Town Centre Public Realm Improvement Scheme | Laois County Council | 100k-500k | 17 Sept 202616d left |
| Mountrath Town Centre Public Realm Improvement Scheme | Laois County Council | 100k-500k | 17 Sept 202616d left |
| Engineering and Environmental Consultancy Services | Offaly County Council | 100k-500k | 18 Sept 202617d left |
| Establishment of a Multi Supplier Framework of Construction Consultancy Services for Small and Minor Projects for the Buildings and Estates Office, UCC | University College Cork | 1M-5M | 18 Sept 202617d left |
| Public lighting upgrade works at IDA Finnabair Business and Technology Park Dundalk Co Louth | IDA Ireland | 100k-500k | 18 Sept 202617d left |
| 2026P060 - Provision of Media Monitoring Services | Central Bank of Ireland | 100k-500k | 18 Sept 202617d left |
| Invitation to Tender for Building (Mechanical and Electrical) Consultancy Services for an Emergency Works Project for the replacement of the gas systems including entire pipework, gas cocks and suppli | Kildare and Wicklow Education and Training Board | 100k-500k | 20 Sept 202619d left |
| Consultant and Project Archaeologist Services for the Office of Public Works Flood Risk Management Division | Office of Public Works (OPW) | 1M-5M | 21 Sept 202620d left |
| 26003 Framework for Facilities Management Consultancy Services | Office of Public Works (OPW) | 1M-5M | 21 Sept 202620d left |
| 1 - Donegal/Leitrim | Inland Fisheries Ireland | 100k-500k | 21 Sept 202620d left |
| SCC2026-0126 Cleveragh Active Travel Scheme | Sligo County Council | <25k | 21 Sept 202620d left |
| Engineer Led Design Team to deliver Stages 2 - 5 of Park Lane Enhancement Works | Roscommon County Council | 25k-100k | 21 Sept 202620d left |
| Provision of an Independent Project Monitor for Capital Works Project on behalf of South East Technological University | South East Technological University (SETU) | 25k-100k | 22 Sept 202621d left |
| Provision of Air Emissions Monitoring Programme (AEMP) of air emission compliance monitoring at selected EPA licensed sites in Ireland | Environmental Protection Agency | 1M-5M | 23 Sept 202622d left |
| Doneraile Weirs Barrier Mitigation Project | Inland Fisheries Ireland | 100k-500k | 24 Sept 202623d left |
| Architectural Services | St. Vincent's University Hospital | >5M | 25 Sept 202624d left |
| CFT for the provision of Consultancy Services | Taighde Éireann – Research Ireland | 1M-5M | 25 Sept 202624d left |
| Nature-based Solutions Catchment Management Plan - Hollyford, Co. Tipperary | Office of Public Works (OPW) | 25k-100k | 25 Sept 202624d left |
| GRETB - Architectural Services for new modular build at GRETB, Boyle VTOS Centre, Lower Marian Road, Boyle, Co Roscommon, F52 X580 | Galway Roscommon Education and Training Board | 100k-500k | 25 Sept 202624d left |
| `HSE Estates SW: Development Control Plans for Bantry General Hospital, St. Finbarr’s Hospital and Mallow General Hospital | Health Service Executive (HSE) | <25k | 25 Sept 202624d left |
| Cahernahallia Bridge and Blackboy Weir Barrier Mitigation Project | Inland Fisheries Ireland | 100k-500k | 28 Sept 202627d left |
| Design Team for design and supervision of a new naíonra (pre-school facility) for Naíonra Philib Barún, An Trá Mhór, Co. Co. Phort Láirge X91 FP29 (Tramore, Co. Waterford) | Naíonra Philib Barún C.L.G. | <25k | 30 Sept 202629d left |
| MI-CFT26-030 Annual Preventative Maintenance and Technical support for a LC-MS/MS Equipment | Marine Institute | 100k-500k | 30 Sept 202629d left |
| Donegal County Council - Multi-Disciplinary Engineering and Other Specialist Technical Consultancy Services for Project Phases 5 to 7 for the Design and Implementation of the Aghilly Road Project | Donegal County Council | 100k-500k | 30 Sept 202629d left |
| Start Your Own Business - SYOB | Longford County Council | 100k-500k | 2 Oct 202631d left |
| OJEU RFI P20896 Standby Generators Maintenance Framework for Dublin and Cork airports | daa plc | 1M-5M | TBC |
| 9927 Soil sampling and Waste Classification | Iarnród Eireann-Irish Rail | 100k-500k | TBC |
| Multi Party Framework for Project Supervisor for the Design Process PSDP Services | Dublin Port Company | 500k-1M | TBC |
| No. 6 Harcourt Street - Conradh na Gaeilge - Resident Engineering Services | Office of Public Works (OPW) | <25k | 1 Oct 202630d left |
| National Coastal Erosion Hazard Mapping (NCEHM) | Office of Public Works (OPW) | 1M-5M | 2 Oct 202631d left |
| ENQEIR1011 - Energy Trading Partner | EirGrid | >5M | TBC |
| Sector Coordination, Networking Coordination and Technical Communications | Sustainable Energy Authority of Ireland | >5M | 25 Sept 202624d left |
| Bremore Ireland Port | Bremore Ireland Port DAC | 500k-1M | TBC |
| Assessment of Lattone No. 2 and Drumgane GWSs, Design Procurement and Management of Works Associated with the Interconnection to the Public Water Supply System, and Statutory Transfer to Uisce Éireann | Leitrim County Council | <25k | 21 Sept 202620d left |
| Consultancy Appointment for Design and Management of the Refurbishment and Upgrade Works to 10 No. Existing Homes and Communal Facility at McCauley Court, Athy, Co. Kildare. | CARLOW VOLUNTARY HOUSING ASSOCIATION COMPANY LIMITED BY GUARANTEE | 25k-100k | 22 Sept 202621d left |
| Heat Pump Supply, Installation and Commissioning IWA Clontarf | Irish Wheelchair Association (IWA) | 25k-100k | 25 Sept 202624d left |
| Site Supervisory Services for Marine Construction Works at Castletownbere Fishery Harbour Centre, Castletownbere, Co. Cork, Ireland | Department of Agriculture Food and the Marine | 100k-500k | 25 Sept 202624d left |
| RFT for the provision of Scheme Climate Change Adaptation Plans - Package B | Office of Public Works (OPW) | 500k-1M | 1 Oct 202630d left |
| Single Party Framework Agreement for the Provision of Design and Project Management Services for the proposed Office Fit-out for the National Treatment Purchase Fund. | National Treatment Purchase Fund | 500k-1M | 1 Oct 202630d left |
| Multi Supplier Framework Agreement for the provision of Engineering Consultancy Services for Transport Projects with an estimated value less than €10 million | Westmeath County Council | >5M | 2 Oct 202631d left |
| Structural/Civil Engineering Services for proposed repair and refurbishment works at the Lower Lighthouse, Sceilg Mhichíl, Co. Kerry | Office of Public Works (OPW) | 100k-500k | 6 Oct 202635d left |
| Sampling and Analysis of Private Water Supplies in County Wexford | Wexford County Council | <25k | 21 Oct 202650d left |
| Bremore Ireland Port | Bremore Ireland Port DAC | 500k-1M | TBC |
| Dublin Only | Electricity Supply Board ( ESB ) | 500k-1M | TBC |
| An Area Monitoring System Service | Department of Agriculture Food and the Marine | >5M | 30 Sept 202629d left |
| IDA Single Supplier Framework for Building Surveyor Services for IDA Buildings Reinstatement Values for Insurance Valuations, 2026-2030 | IDA Ireland | 100k-500k | 2 Oct 202631d left |
| Framework Agreement for Traffic and Transport Survey Resources for transport related projects funded by the National Transport Authority | National Transport Authority | 1M-5M | 2 Oct 202631d left |
| Revised Framework for Environmental DNA extraction, metabarcoding, and qPCR analysis | Inland Fisheries Ireland | 100k-500k | 9 Oct 202638d left |