Skip to main content
Open

9840 Design and Build Enabling Works at the DART+ and MetroLink Interface at Glasnevin

Sector

Construction

Deadline

Not specified

Estimated Value

€200.0M

Value Range

>5M

Procedure

Restricted Procedure

Procurement Type

Not specified

Published

2026-07-24

Resource ID

515224-2026

CPV Classification

Common Procurement Vocabulary: the EU codes that classify what this contract is for.

  • 45000000 Construction work
  • 45100000 Construction work
  • 45111000 Construction work
  • 45111210 Construction work
  • 45111213 Construction work
  • 45111230 Construction work
  • 45111240 Construction work
  • 45111250 Construction work
  • 45111291 Construction work
  • 45112000 Construction work
  • 45112100 Construction work
  • 45112210 Construction work
  • 45112300 Construction work
  • 45112340 Construction work
  • 45112450 Construction work
  • 45112400 Construction work
  • 45112500 Construction work
  • 45112700 Construction work
  • 45113000 Construction work
  • 45121000 Construction work
  • 45200000 Construction work
  • 45210000 Construction work
  • 45213000 Construction work
  • 45213320 Construction work
  • 45213321 Construction work
  • 45213322 Construction work
  • 45221112 Construction work
  • 45221122 Construction work
  • 45221220 Construction work
  • 45221242 Construction work
  • 45230000 Construction work
  • 45232452 Construction work
  • 45234100 Construction work
  • 45234113 Construction work
  • 45234114 Construction work
  • 45234120 Construction work
  • 50220000 Repair and maintenance services
  • 31682400 Electrical machinery, apparatus, equipment and consumables; lighting
  • 45233000 Construction work
  • 45233140 Construction work

Summary

This contract involves the design and build of enabling works at the interface between the DART+ (Dublin Area Rapid Transit upgrade) and MetroLink projects at Glasnevin. The work comprises civil construction, track infrastructure, and associated enabling works to facilitate the integration of these two major Dublin transport schemes.

The €200 million contract represents significant rail infrastructure development requiring coordination between multiple transport infrastructure projects.

Keywords

rail-infrastructuredesign-and-buildenabling-worksDART-MetroLinkcivil-workstrack-construction
View Official Notice

Suppliers with a matching track record

Ranked by CPV overlap, sector, value band, and region. Score is deterministic from TED award history.

  • Hall Power Ltd

    CPV division overlap; construction sector match; value band matches (>5M)

    57.5/100
  • Killaree lighting services

    CPV division overlap; construction sector match; value band matches (>5M)

    57.5/100
  • S.A.

    2 shared CPV code(s): 31682400, 50220000; construction sector match; adjacent value band

    54.4/100
  • Sacyr Neopul

    2 shared CPV code(s): 31682400, 50220000; construction sector match; adjacent value band

    54.4/100
  • DE POWER SOLUTIONS LTD

    CPV division overlap; construction sector match; adjacent value band

    52.5/100

Based on CPV codes, sector, value band, and region from captured award notices. Verify suitability before outreach.

Procurement-ready software

Suppliers bidding on Construction tenders often need compliant Irish software. Compare verified options:

Irish compliance verified, Revenue, PAYE, GDPR. Powered by Vendors.ie

Don't miss the next one

New Construction tenders in your inbox every Monday morning, the week they publish. Free.

By subscribing you agree to our Privacy Policy. Weekly email, unsubscribe anytime.

Looking for grants too? Browse Irish business supports