9548 Wicklow Station BEMU Charging Infrastructure System Project
Contracting Authority
Sector
Deadline
Not specified
Estimated Value
€20.0M
Value Range
>5M
Procedure
Not specified
Published
2026-03-19
Resource ID
192656-2026
Summary
This is a call for competition by Iarnród Éireann – Irish Rail (“IÉ”) seeking suitably qualified candidates to participate in the tender competition for the design and build of the Battery Electric Multiple Unit (BEMU) Charging Infrastructure System Project (the “BEMU Project”). The Project will provide battery train charging infrastructure at Wicklow Station, County Wicklow in Ireland (“BEMU Charging Infrastructure System Project”)(Reference: 9548).
The BEMU Charging Infrastructure System Project forms a part of the Wicklow Rail Capacity Enhancement Project (the “WCE Project”) which is a strategic initiative led by IÉ to improve rail connectivity between Dublin City Centre and Wicklow Town. It supports sustainable travel, addresses increasing passenger demand, and aligns with national decarbonisation goals.
The project is part of the National Transport Authority’s Greater Dublin Area Transport Strategy 2022–2042, specifically under Measure RAIL3 – DART Extension. The preferred operational model to deliver on the WCE objectives involves deploying BEMUs to provide one train per hour per direction between Dublin and Wicklow.
IÉ has already made the first order of BEMU trains which are expected to enter into service during [2026]. For BEMUs to operate successfully, charging facilities are required to recharge the batteries.
Following development of new facilities at Drogheda Station, IÉ has identified the Southern Line as the next phase for the expansion of the BEMU deployment, with Wicklow Station as the preferred charging station location. The BEMU trains will utilise the existing overhead line equipment north of Greystones and run-on battery power between Greystones and Wicklow, where they will be charged.
Keywords
Analyse this tender
Related Tenders in Construction
stay accommodation construction work – Proposed development of a glamping facility to inclue 6 number glamping pods, an administration unit and associated site works including parking at Barnane Rectory, Barnane, Templemore, Co. Tipperary
Ely Haven Limited
School Roof Refurbishment and Associated Works
Holy Child National School (Naas)
25-04 Pharmacy Transition Works Laboratory Development
South East Technological University (SETU)
Letterkenny Community Centre
Letterkenny Community Centre CLG