The Multiple Sclerosis Society of Ireland - contract awards
The Multiple Sclerosis Society of Ireland has awarded 2 contracts totalling €1.0M between 2025 and 2026. Top supplier by disclosed value is Bracegrade Limited (1 award).
Download 2 awarded contracts
CC BY 4.0 · sourced from TEDEndpoints are public, no auth. Columns and shape are pinned — see about Tenderwatch for the contract.
2
Awards
€1.0M
Disclosed value
€1.0M
Average per award
1
With named winner
Top suppliers awarded
- 1.Bracegrade Limited1 · Not disclosed
Year-by-year
| Year | Awards | Value |
|---|---|---|
| 2025 | 1 | - |
| 2026 | 1 | €1.0M |
Track who wins The Multiple Sclerosis Society of Ireland contracts
Pick a company below. When it wins a new public contract, it appears in your weekly Tenderwatch digest under "Companies you watch". Free.
By value band
- €1M-€5M1 · €1.0M
Competition intensity
- Awards with bid data
- 1
- Sole bidder (no competition)
- 0
- Most contested award
- Construction Works to The Multiple Sclerosis Society of Ireland Care and Respite Centre at 65 Bushy Park, Dublin 6
- 4 bids received
Least contested above 1 bid: Construction Works to The Multiple Sclerosis Society of Ireland Care and Respite Centre at 65 Bushy Park, Dublin 6 (4 bids)
By procedure
- Open Procedure: 1
Supplier intelligence
Top-3 suppliers account for 0% of €1.0M total disclosed value — a market-concentration signal.
| Supplier | Share | CRO status | Other bodies (join 4) |
|---|---|---|---|
| Bracegrade Limited | 0% | Normal | also won €42.5M across 4 other Irish bodies → |
Notices published in the last 90 days
| Published | Title | Winner | Value |
|---|---|---|---|
| 14 August 2026 | Construction Works to The Multiple Sclerosis Society of Ireland Care and Respite Centre at 65 Bushy Park, Dublin 6 | undisclosed | €1.0M |
Award history (2 records)
| Date | Title | Winner | Bids | Procedure | Value |
|---|---|---|---|---|---|
| 14 August 2026 | Construction Works to The Multiple Sclerosis Society of Ireland Care and Respite Centre at 65 Bushy Park, Dublin 6 | undisclosed | — | €1.0M | |
| 25 June 2025 | Construction Works to The Multiple Sclerosis Society of Ireland Care and Respite Centre at 65 Bushy Park, Dublin 6 | Bracegrade Limited | 4 | Open Procedure | - |
Last updated 3 September 2026. Award dataset coverage begins 2025-06-25. Sentinel TED values (€0, €1) are excluded from totals and averages.
Other major buyers