St. Anne's Secondary School (Tipperary) - contract awards
Who wins St. Anne's Secondary School (Tipperary) contracts, and how hard it is to break in
St. Anne's Secondary School (Tipperary) has awarded 2 contracts between 2017 and 2020. Top supplier by disclosed value is gerard quirke construction LTD (1 award).
No company has yet won here in more than one year, so the field is more open than most. 1 of the 2 awards with a published bid count drew a single bidder.
Concentration like this is where a newcomer reads its odds. Thin fields and single-bidder contracts are the openings.
Follow a supplier that wins St. Anne's Secondary School (Tipperary) work
Download 2 awarded contracts
CC BY 4.0 · sourced from TEDEndpoints are public, no auth. Columns and shape are pinned — see about Tenderwatch for the contract.
2
Awards
Not disclosed
Disclosed value
-
Average per award
2
With named winner
Top suppliers awarded
- 1.gerard quirke construction LTD1 · Not disclosed
- 2.Kamec Engineering Limited1 · Not disclosed
Year-by-year
| Year | Awards | Value |
|---|---|---|
| 2017 | 1 | - |
| 2020 | 1 | - |
Track who wins St. Anne's Secondary School (Tipperary) contracts
Pick a company below. When it wins a new public contract, it appears in your scoped monitoring email under "Companies you watch". Watching one company is free.
Competition intensity
- Awards with bid data
- 2
- Sole bidder (no competition)
- 1
- Most contested award
- Widening corridors and linking corridors to main building
- 3 bids received
Least contested above 1 bid: Widening corridors and linking corridors to main building (3 bids)
By procedure
- Open Procedure: 2
Supplier intelligence
| Supplier | Share | CRO status | Other bodies (join 4) |
|---|---|---|---|
| gerard quirke construction LTD | — | — | also won Not disclosed across 2 other Irish bodies → |
| Kamec Engineering Limited | — | Normal | also won €248k across 2 other Irish bodies → |
Award history (2 records)
| Date | Title | Winner | Bids | Procedure | Value |
|---|---|---|---|---|---|
| 12 October 2020 | Widening corridors and linking corridors to main building | gerard quirke construction LTD | 3 | Open Procedure | - |
| 6 July 2017 | Replace the existing LPHW Heating System in the school, including removal of existing, connection of new gas mains and installation of new heating centre and heating system throughout the school. | Kamec Engineering Limited | 1 | Open Procedure | - |
Last updated 9 September 2026. Award dataset coverage begins 2017-07-06. Sentinel TED values (€0, €1) are excluded from totals and averages.
Other major buyers